I-290 Northborough Commuter Rail Extension Feasibility Study (April 2002)
MBTA Bus Route 66 Arterial
Improvement Study (January 2002)
MBTA Water Transportation
Service:
2000 Passenger Survey (March 2001)
MBTA Old Colony Commuter Rail Service Restoration
Transportation Impact Study (January 2001)
MBTA Old Colony Commuter Rail Service Restoration 1998 Passenger
Survey (January 2001)
1997 Passenger Counts: MBTA Rapid Transit and Green Line Central
Subway (April 1999)
Suburban Public Transportation (August
1998)
Millis Commuter Rail Extension Feasibility Study (March 1998)
MBTA Systemwide Passenger Survey: Red Line (September 1997)
MBTA Systemwide Passenger Survey: Bus System 1995 (November
1997)
1996 Fare-Mix Study (July 1997)
Bourne Commuter Rail Feasibility Study, (March 1997)
MBTA Systemwide Passenger Survey: Green Line (January 1997)
Central Mass. Rail Feasibility Study (December 1996)
MBTA Systemwide Passenger Survey: Rapid Transit/Light Rail 1994:
Orange Line (August 1996)
MBTA Systemwide Passenger Survey: Rapid Transit/Light Rail 1994:
Blue Line (May 1996)
1995 MBTA Passenger Counts: Surface Green Line (December
1995)
1993 Survey of Commuter Boat Riders: Northbound Hingham-to-Boston
Service (October 1994)
1992 Fare-Mix Study: MBTA Rapid Transit, Surface Green Line, Bus,
and Commuter Rail Service: Ridership and Average Fares (August 1994)
Commuting in a New Century: Executive Summary and Supplemental
Information for the New Program for Mass Transportation (produced for the Executive Office
of Transportation and Construction. (June 1994)
Commuting in a New Century: The New Program for Mass Transportation
(produced for the Executive Office of Transportation and Construction; March 1994);
Appendices (March 1994)
1992 Commuter Rail Survey: Summary of Results (December 1992)
1989 MBTA Fare-Mix Study: Rapid Transit, Surface Green Line, and Bus
Service: Ridership and Average Fares (April 1992)
Analysis of Winter 1989-90 Bus Service Changes: Routes 8, 47, 61,
63, 64, 66, 70, and 86 (August 1991)
1989 Passenger Counts: MBTA Rapid Transit and Commuter Rail (August
1991); Appendix: Data Collection and Processing Procedures at Downtown Transfer
Stations (August 1991)
Survey of Water Shuttle Customers, May 19 and May 23, 1990:
Charlestown Navy Yard/Pier 4-Boston/Long Wharf Service (March 1991); Executive Summary (December
1990)
MBTA Revenue and Service Environmental Impact Report: 1989 Fare
Increase (November 1990)
Survey of Commuter Boat Customers, April 19, 1990: Hingham-to-Boston
Service (October 1990); Executive Summary (August 1990)
South Corridor Bus Service Study (June 1990); Technical
Supplement 1 (June 1990); Technical Supplement 2 (June 1990)
West Corridor Bus Service Study (April 1990); Supplement 1 (April
1990); Supplement 2 (April 1990)