Summary of Highway and Transit Programming

 

2018 Boston Region Transportation Improvement Program       2018 GHG Tracking for Boston Region Transportation Improvement Program
     
Amendment /
Adjustment Type ▼
STIP                             Program ▼ MassDOT Project ID Metropolitan Planning Organization ▼ Municipality Name ▼ MassDOT                                                                                                              Project                                                                                               Description MassDOT  District Funding                       Source Total Programmed                Funds Federal                    Funds Non-Federal                        Funds Additional Information ▼                                   Present information as follows, if applicable: a) Planning / Design / or Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information MassDOT Project ID MassDOT                                                                                                              Project Description Total Programmed                Funds GHG        Analysis  Type GHG CO2 Impact (kg/yr) GHG                                                                          Impact Description Additional                                                                          Description
             
►Section 1A / Regionally Prioritized Projects ►Section 1A / Regionally Prioritized Projects
             
►Regionally Prioritized Projects           ►Regionally Prioritized Projects          
  Roadway reconstruction program 600518 Boston Region Hingham HINGHAM- INTERSECTION IMPROVEMENTS AT DERBY STREET, WHITING STREET (ROUTE 53) AND GARDNER STREET 5 HSIP  $611,547  $550,392  $61,155 Construction; STP+HSIP Total Cost = $2,844,392; MPO Evaluation Score = 28 600518 HINGHAM- INTERSECTION IMPROVEMENTS AT DERBY STREET, WHITING STREET (ROUTE 53) AND GARDNER STREET  $611,547        
Roadway reconstruction program 600518 Boston Region Hingham HINGHAM- INTERSECTION IMPROVEMENTS AT DERBY STREET, WHITING STREET (ROUTE 53) AND GARDNER STREET 5 STP  $2,232,845  $1,786,276  $446,569 Construction; STP+HSIP Total Cost = $2,844,392; MPO Evaluation Score = 28              
Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 CMAQ  $13,427,220  $10,741,776  $2,685,444 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; funding flexed to FTA; match provided by local
contributions; AC Yr 3 of 6
             
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 STP  $33,072,780  $26,458,224  $6,614,556 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; funding flexed to FTA; match provided by local
contributions; AC Yr 3 of 6
1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR  $33,072,780        
  Roadway reconstruction program 604989 Boston Region Southborough SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET 6 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+TAP+STP Total Cost = $7,271,690; MPO Evaluation Score = 42              
  Roadway reconstruction program 604989 Boston Region Southborough SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET 3 TAP  $1,456,250  $1,165,000  $291,250 Construction; CMAQ+TAP+STP Total Cost = $7,271,690; MPO Evaluation Score = 42              
  Roadway reconstruction program 604989 Boston Region Southborough SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET 3 STP  $4,815,440  $3,852,352  $963,088 Construction; CMAQ+TAP+STP Total Cost = $7,271,690; MPO Evaluation Score = 42              
  Roadway reconstruction program 605110 Boston Region Brookline BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) 6 CMAQ  $1,000,000  $800,000  $200,000 Construction; TAP+STP+CMAQ+Private Sector Constribution ($1,000,000) = $7,000,834; MPO Evaluation Score = 68              
  Roadway reconstruction program 605110 Boston Region Brookline BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) 6 TAP  $1,255,000  $1,004,000  $251,000 Construction; TAP+STP+CMAQ+Private Sector Constribution ($1,000,000) = $7,000,834; MPO Evaluation Score = 68              
  Roadway reconstruction program 605110 Boston Region Brookline BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) 6 STP  $3,745,834  $2,996,667  $749,167 Construction; TAP+STP+CMAQ+Private Sector Constribution ($1,000,000) = $7,000,834; MPO Evaluation Score = 68              
  Capacity program 601630 Boston Region Multiple WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 6 STP  $27,631,758  $22,105,406  $5,526,352 Construction; STP+NHPP+HSIP+TEA-21 Earmark+BR Total Cost = $81,812,268; AC Yr 3 of 3 (project originally funded into FFY 2019, but all remaining funding was transferred into FFY 2018)              
  Capacity program 603711 Boston Region Multiple NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) 6 NHPP  $1,988,367  $1,590,694  $397,673 Construction; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($1,988,367 programmed within FFYs 2018-22 TIP)  603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V)  $1,988,367        
  Bicycles and pedestrians program 608352 Boston Region Salem SALEM- CANAL STREET RAIL TRAIL CONSTRUCTION (PHASE 2) 4 TAP  $2,787,456  $2,229,965  $557,491 Construction; TAP Total Cost = $2,787,456; MPO Evaluation Score = 37              
Regionally Prioritized Projects subtotal ►  $95,024,497  $76,080,752  $18,943,745 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Section 1A / Fiscal Constraint Analysis                      
Total Regional Federal Aid Funds Programmed ►  $95,024,497  $95,038,936 ◄Total Budget  $14,439 Target Funds Available              
Section 1A instructions: MPO Template Name) Choose Regional Name from dropdown list to populate header and MPO column; Column C) Enter ID from ProjectInfo; Column E) Choose Municipality Name from dropdown list; Column H) Choose the Funding Source being used for the project - if multiple funding sources are being used enter multiple lines; Column I) Enter the total amount of funds being programmed in this fiscal year and for each funding source; Column J) Federal funds autocalculates. Please verify the amount and only change if needed for flex. Column K) Non-federal funds autocalculates. Please verify the split/match - if matching an FTA flex, coordinate with Rail & Transit Division before programming; Column L) Enter Additional Information as described - please do not use any other format. STP programmed ►  $73,487,024  $77,071,365 ◄ Max STP  $3,584,341 STP available              
HSIP programmed ►  $611,547  $4,296,710 ◄ Min. HSIP  $3,685,163 HSIP recommended not met              
CMAQ programmed ►  $15,427,220  $10,741,776 ◄ Min. CMAQ  $(4,685,444) CMAQ recommended met              
TAP programmed ►  $5,498,706  $2,929,085 ◄ Min. TAP  $(2,569,621) TAP amount exceeded!              
Remaining HSIP, CMAQ, and TAP Funds  $14,439                    
►Section 1B / Earmark or Discretionary Grant Funded Projects ►Section 1B / Earmark or Discretionary Grant Funded Projects
             
►Other Federal Aid           ►Other Federal Aid          
  Earmark Discretionary 606134 Boston Region Boston BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET 6 HPP  $2,501,046  $2,000,837  $500,209 Construction; HPP 2129 (MA155) 606134 BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET  $2,501,046        
  Earmark Discretionary Project # Boston Municipalities Description District HPP  $-    $-    $-     Project # Description  $-          
Other Federal Aid subtotal ►  $2,501,046  $2,000,837  $500,209 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
               
►Section 2A / State Prioritized Reliability Projects ►Section 2A / State Prioritized Reliability Projects
             
►Bridge Program / Inspections           ►Bridge Program / Inspections          
  Bridge Program Project # Statewide N/A Bridge Inspection Multiple NHPP  $-    $-    $-     Project # Bridge Inspection  $-          
Bridge Program / Inspections subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / Off-System           ►Bridge Program / Off-System          
  Bridge Program 606632 Boston Region Multiple HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER 3 STP-BR-OFF  $12,993,071  $10,394,457  $2,598,614 Construction 606632 HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER  $12,993,071        
  Bridge Program 604655 Boston Region Marshfield MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER 5 STP-BR-OFF  $4,189,856  $3,351,884  $837,971 Construction 604655 MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER  $4,189,856        
  Bridge Program 607533 Boston Region Waltham WALTHAM- BRIDGE REPLACEMENT, W-04-006, WOERD AVENUE OVER CHARLES RIVER 4 STP-BR-OFF  $2,197,943  $1,758,354  $439,589 Construction 607533 WALTHAM- BRIDGE REPLACEMENT, W-04-006, WOERD AVENUE OVER CHARLES RIVER  $2,197,943        
Bridge Program / Off-System subtotal ►  $19,380,870  $15,504,696  $3,876,174 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (NHS)           ►Bridge Program / On-System (NHS)          
  Bridge Program 604952 Boston Region Multiple LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) 4 NHPP-On  $51,527,391  $41,221,913  $10,305,478 Construction 604952 LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE)  $51,527,391        
  Bridge Program 604173 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR 6 NHPP-On  $42,000,000  $33,600,000  $8,400,000 Construction / AC Year 2 of 5, Total Cost $144,066,616 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR  $42,000,000        
Bridge Program / On-System (NHS) subtotal ►  $93,527,391  $74,821,913  $18,705,478 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Bridge Program / On-System (Non-NHS)           ►Bridge Program / On-System (Non-NHS)          
  Bridge Program Project # MPO N/A Description District NHPP-Off  $-  $-    $-     Project # Description  $-          
Bridge Program / On-System (Non-NHS) subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / Systematic Maintenance           ►Bridge Program / Systematic Maintenance          
  Bridge Program 607915 Boston Region Multiple NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N-12-056 ON I-95/ROUTE 128 6 NHPP-On  $1,596,667  $1,277,334  $319,333 Construction 607915 NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N-12-056 ON I-95/ROUTE 128  $1,596,667        
  Bridge Program 608521 Boston Region Salem SALEM- BRIDGE MAINTENANCE, S-01-018 (32T), (ST 114) NORTH STREET OVER (ST 107) BRIDGE STREET & MBTA 4 NHPP-Off  $2,400,000  $1,920,000  $480,000 Construction 608521 SALEM- BRIDGE MAINTENANCE, S-01-018 (32T), (ST 114) NORTH STREET OVER (ST 107) BRIDGE STREET & MBTA  $2,400,000        
Bridge Program / Systematic Maintenance subtotal ►  $3,996,667  $3,197,334  $799,333 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Interstate Pavement           ►Interstate Pavement          
  Interstate Pavement 608823 Boston Region Multiple WELLESLEY- NEWTON- WESTON- PAVEMENT RESURFACING AND RELATED WORK ON I-95 6 NHPP  $6,074,640  $5,467,176  $607,464 Construction 608823 WELLESLEY- NEWTON- WESTON- PAVEMENT RESURFACING AND RELATED WORK ON I-95  $6,074,640        
Insterstate Pavement subtotal ►  $6,074,640  $5,467,176  $607,464 ◄ 90% Federal + 10% Non-Federal     Quantified Impact ► 0    
             
►Non-Interstate Pavement           ►Non-Interstate Pavement          
  Non-Interstate Pavement 608008 Boston Region Saugus SAUGUS- RESURFACING AND RELATED WORK ON ROUTE 1 4 NHPP  $9,812,880  $7,850,304  $1,962,576 Construction 608008 SAUGUS- RESURFACING AND RELATED WORK ON ROUTE 1  $9,812,880        
  Non-Interstate Pavement 608478 Boston Region Concord CONCORD- RESURFACING AND RELATED WORK ON ROUTE 2 4 NHPP  $4,248,000  $3,398,400  $849,600 Construction 608478 CONCORD- RESURFACING AND RELATED WORK ON ROUTE 2  $4,248,000        
  Non-Interstate Pavement 608379 Boston Region Multiple LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2 4 NHPP  $8,437,000  $6,749,600  $1,687,400 Construction / Includes $1,040,000 of stormwater improvements 608379 LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2  $8,437,000        
  Non-Interstate Pavement 608069 Boston Region Multiple MARSHFIELD- PEMBROKE- NORWELL- HANOVER- ROCKLAND- HINGHAM- RESURFACING & RELATED WORK ON ROUTE 3 5 NHPP  $13,876,216  $11,100,973  $2,775,243 Construction / Includes $400,000 of stormwater improvements 608069 MARSHFIELD- PEMBROKE- NORWELL- HANOVER- ROCKLAND- HINGHAM- RESURFACING & RELATED WORK ON ROUTE 3  $13,876,216        
Non-Interstate Pavement subtotal ►  $36,374,096  $29,099,277  $7,274,819 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
► Roadway Improvements           ► Roadway Improvements          
  Roadway Improvements Project # MPO Multiple Description District STP  $-    $-    $-     Project # Description  $-          
Roadway Improvements subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Safety Improvements           ► Safety Improvements          
  Safety Improvements 606381 Boston Region Multiple ARLINGTON- BELMONT- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2  4 STP  $9,100,506  $7,280,405  $1,820,101 Construction 606381 ARLINGTON- BELMONT- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2   $9,100,506        
Safety Improvements subtotal ►  $9,100,506  $7,280,405  $1,820,101 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 2B / State Prioritized Modernization Projects ►Section 2B / State Prioritized Modernization Projects
             
► ADA Retrofits           ► ADA Retrofits          
  ADA Retrofits Project # MPO Municipalities Description District STP  $-    $-    $-     Project # Description  $-          
ADA Retrofits subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Intersection Improvements           ►Intersection Improvements          
  Intersection Improvements 608651 Boston Region Braintree BRAINTREE- ADAPTIVE SIGNAL CONTROLS ON ROUTE 37 (GRANITE STREET) 6 CMAQ  $500,000  $400,000  $100,000 Construction 608651 BRAINTREE- ADAPTIVE SIGNAL CONTROLS ON ROUTE 37 (GRANITE STREET)  $500,000        
Intersection Improvements subtotal ►  $500,000  $400,000  $100,000 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Intelligent Transportation Systems           ►Intelligent Transportation Systems          
  Intelligent Transportation Systems Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Intelligent Transportation System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Roadway Reconstruction           ►Roadway Reconstruction          
  Roadway Reconstruction Project # MPO N/A Description District CMAQ  $-    $-    $-     Project # Description  $-          
Roadway Reconstruction subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Section 2C / State Prioritized Expansion Projects ►Section 2C / State Prioritized Expansion Projects
             
►Bicycles and Pedestrians           ►Bicycles and Pedestrians          
  Bicycles and Pedestrians 607732 Boston Region Multiple FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30 3 CMAQ  $9,770,863  $7,816,690  $1,954,173 Construction / PSAC score 35.5 607732 FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30  $9,770,863        
Bicycles and Pedestrians subtotal ►  $9,770,863  $7,816,690  $1,954,173 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Capacity           ►Capacity          
  Capacity Project # MPO Municipalities Description District CMAQ  $-    $-    $-     Project # Description  $-          
Capacity subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 3 / Planning / Adjustments / Pass-throughs ►Section 3 / Planning / Adjustments / Pass-throughs
             
►Planning / Adjustments / Pass-throughs           ►Planning / Adjustments / Pass-throughs          
  Planning / Adjustments / Pass-throughs Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Other Statewide Items subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
             
►Section 4 / Non-Federally Aided Projects ►Section 2A / Non-Federal Projects
             
►Non-Federally Aided Projects           ►Non-Federally Aided Projects          
  Non Federal Aid Project # MPO Municipalities Description District NFA  $-      $-     Project # Description  $-          
Non-Federal Aid subtotal►  $-      $-   ◄100% Non-Federal     Quantified Impact ► 0    
             
2018 Summary TIP Section 1 - 3: ▼ TIP Section 4: ▼ Total of All Projects ▼     2018 X Region MPO GHG Tracking Summary Total Quantified Impact ▼    
Total ►  $276,250,576  $-    $276,250,576 ◄ Total Spending in Region     Quantified Impact ► #REF!    
Federal Funds ►  $221,669,080    $221,669,080 ◄ Total Federal Spending in Region              
Non-Federal Funds ►  $54,581,497  $-    $54,581,497 ◄ Total Non-Federal Spending in Region              
701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008.  Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road.  The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority.  For all projects contained in the TIP, the Commonwealth is the Awarding Authority.  Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation.   This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website:  http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

Transportation Improvement Program (TIP)
Project List (FY2018)
FTA Program Project Number Transit Agency FTA Activity Line Item Project Description Carryover (unobligated) Federal Funds State Funds TDC Local Funds Total Cost
5307                    
5307 RTD0005465 Cape Ann Transportation Authority 117A00 PREVENTIVE MAINTENANCE $350,000 $0 $0 $87,500 $437,500
5307 RTD0005467 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQ/SOFTWARE MAINT $40,000 $10,000 $0 $0 $50,000
5307 RTD0005469 Cape Ann Transportation Authority 114220 ACQUIRE - MISC SUPPORT EQUIPMENT $27,267 $6,817 $0 $0 $34,084
5307 RTD0005473 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQUIPMENT $52,000 $13,000 $0 $0 $65,000
5307 RTD0005474 Cape Ann Transportation Authority 113410 REHAB- SHELTERS Railroad, P&R, Emerson Ave $33,600 $8,400 $0 $0 $42,000
5307 RTD0005475 Cape Ann Transportation Authority 113310 CONSTRUCT - BUS SHELTER-CATA HUB/COA $14,400 $3,600 $0 $0 $18,000
5307 RTD0005476 Cape Ann Transportation Authority 113410 REHAB/RENOVATE - BUS PASSENGER SHELTERS $9,600 $2,400 $0 $0 $12,000
5307 RTD0005989 MetroWest Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) $150,000 $37,500 $0 $0 $187,500
5307 RTD0005990 MetroWest Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV $1,300,000 $325,000 $0 $0 $1,625,000
5307 RTD0005991 MetroWest Regional Transit Authority 114200 ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES $248,415 $62,104 $0 $0 $310,519
5307 RTD0005992 MetroWest Regional Transit Authority 440000 Mobility Management $25,000 $6,250 $0 $0 $31,250
5307 RTD0006350 Massachusetts Bay Transportation Authority (MBTA) 121200 Revenue Vehicle Program $76,000,000 $0 $0 $19,000,000 $95,000,000
5307 RTD0006351 Massachusetts Bay Transportation Authority (MBTA) 126301 Systemwide Signals Program $65,446,986 $0 $0 $16,361,747 $81,808,733
          Subtotal $143,697,268 $475,071 $0 $35,449,247 $179,621,586
5309                    
5309 RTD0005980 Massachusetts Bay Transportation Authority (MBTA) 132303 Green Line Extension Project $150,000,000 $0 $0 $147,878,038 $297,878,038
          Subtotal $150,000,000 $0 $0 $147,878,038 $297,878,038
5310                    
          Subtotal $0 $0 $0 $0 $0
5311                    
          Subtotal $0 $0 $0 $0 $0
5337                    
5337 RTD0006352 Massachusetts Bay Transportation Authority (MBTA) 122405 Bridge & Tunnel Program $72,000,000 $0 $0 $18,000,000 $90,000,000
5337 RTD0006353 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $50,401,533 $0 $0 $12,600,383 $63,001,916
5337 RTD0006354 Massachusetts Bay Transportation Authority (MBTA) 124400 System Upgrades Program $20,000,000 $0 $0 $5,000,000 $25,000,000
          Subtotal $142,401,533 $0 $0 $35,600,383 $178,001,916
5339                    
5339 RTD0006355 Massachusetts Bay Transportation Authority (MBTA) 111400 Bus Program $5,318,786 $0 $0 $1,329,696 $6,648,482
          Subtotal $5,318,786 $0 $0 $1,329,696 $6,648,482
5320                    
          Subtotal $0 $0 $0 $0 $0
Other Federal                    
          Subtotal $0 $0 $0 $0 $0
Other Non-Federal                    
Other Non-Federal RTD0006002 MetroWest Regional Transit Authority 115320 CONSTRUCT MISC ELEC/POWER EQUIP $0 $750,000 $0 $0 $750,000
          Subtotal $0 $750,000 $0 $0 $750,000
          Total $441,417,587 $1,225,071 $0 $220,257,364 $662,900,022
Funds listed under the Carry Over column are included in the Federal Amount

 

2019 Boston Region Transportation Improvement Program       2019 GHG Tracking for Boston Region Transportation Improvement Program
     
Amendment /
Adjustment Type ▼
STIP                             Program ▼ MassDOT Project ID Metropolitan Planning Organization ▼ Municipality Name ▼ MassDOT                                                                                                              Project                                                                                               Description MassDOT  District Funding                       Source Total Programmed                Funds Federal                    Funds Non-Federal                        Funds Additional Information ▼                                   Present information as follows, if applicable: a) Planning / Design / or Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information MassDOT Project ID MassDOT                                                                                                              Project Description Total Programmed                Funds GHG        Analysis  Type GHG CO2 Impact (kg/yr) GHG                                                                          Impact Description Additional                                                                          Description
             
►Section 1A / Regionally Prioritized Projects ►Section 1A / Regionally Prioritized Projects
             
►Regionally Prioritized Projects           ►Regionally Prioritized Projects          
  Roadway reconstruction program 607428 Boston Region Multiple HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE 140. 3 HSIP  $1,940,476  $1,746,428  $194,048 Construction; CMAQ+HSIP Total Cost = $2,727,881; MPO Evaluation Score = 54 607428 HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE 140.  $1,940,476        
  Roadway reconstruction program 607428 Boston Region Multiple HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE 140. 3 CMAQ  $787,405  $629,924  $157,481 Construction; CMAQ+HSIP Total Cost = $2,727,881; MPO Evaluation Score = 54 607428 HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE 140.  $787,405        
  Roadway reconstruction program 607652 Boston Region Everett EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET 4 HSIP  $1,448,825  $1,303,943  $144,883 Cosntruction; CMAQ+STP+HSIP+TAP Total Cost = $16,599,002; MPO Evaluation Score = 73 607652 EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET  $1,448,825        
  Roadway reconstruction program 607652 Boston Region Everett EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET 4 CMAQ  $1,275,588  $1,020,470  $255,118 Cosntruction; CMAQ+STP+HSIP+TAP Total Cost = $16,599,002; MPO Evaluation Score = 73 607652 EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET  $1,275,588        
  Roadway reconstruction program 607652 Boston Region Everett EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET 4 TAP  $724,412  $579,530  $144,882 Cosntruction; CMAQ+STP+HSIP+TAP Total Cost = $16,599,002; MPO Evaluation Score = 73 607652 EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET  $724,412        
  Roadway reconstruction program 607652 Boston Region Everett EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET 4 STP  $13,150,177  $10,520,142  $2,630,035 Cosntruction; CMAQ+STP+HSIP+TAP Total Cost = $16,599,002; MPO Evaluation Score = 73              
  Roadway reconstruction program 606043 Boston Region Hopkinton HOPKINTON- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 135 3 HSIP  $1,275,206  $1,147,685  $127,521 Construction; CMAQ+HSIP+STP Total Cost = $8,174,400              
  Roadway reconstruction program 606043 Boston Region Hopkinton HOPKINTON- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 135 3 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+HSIP+STP Total Cost = $8,174,400              
  Roadway reconstruction program 606043 Boston Region Hopkinton HOPKINTON- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 135 3 TAP  $5,899,194  $4,719,355  $1,179,839 Construction; CMAQ+HSIP+STP Total Cost = $8,174,400              
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 CMAQ  $13,427,220  $10,741,776  $2,685,444 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 4 of 6; funding flexed to FTA; match provided by local
contributions
             
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 STP  $27,072,780  $21,658,224  $5,414,556 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 4 of 6; funding flexed to FTA; match provided by local
contributions
             
  Roadway reconstruction program 605034 Boston Region Natick NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. 3 CMAQ  $2,415,334  $1,932,267  $483,067 Construction; CMAQ+TAP+STP Total Cost = $12,688,000; MPO Evaluation Score = 60              
  Roadway reconstruction program 605034 Boston Region Natick NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. 3 TAP  $1,318,933  $1,055,146  $263,787 Construction; CMAQ+TAP+STP Total Cost = $12,688,000; MPO Evaluation Score = 60              
  Roadway reconstruction program 605034 Boston Region Natick NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. 3 STP  $8,953,733  $7,162,986  $1,790,747 Construction; CMAQ+TAP+STP Total Cost = $12,688,000; MPO Evaluation Score = 60              
  Roadway reconstruction program 605789 Boston Region Boston BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD 6 STP  $7,348,506  $5,878,805  $1,469,701 Construction; STP+Earmark Total Cost = $24,792,845 ; MPO Evaluation Score = 59              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM-NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO REOUT 9 (NEWTON) 6 HSIP  $2,319,644  $2,087,680  $231,964 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 1 of 2; MPO Evaluation Score = 75              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM-NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO REOUT 9 (NEWTON) 6 CMAQ  $2,000,000  $1,600,000  $400,000 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 1 of 2; MPO Evaluation Score = 75              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM-NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO REOUT 9 (NEWTON) 6 TAP  $1,546,492  $1,237,194  $309,298 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 1 of 2; MPO Evaluation Score = 75              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM-NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO REOUT 9 (NEWTON) 6 STP  $4,851,064  $3,880,851  $970,213 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 1 of 2; MPO Evaluation Score = 75              
Regionally Prioritized Projects subtotal ►  $6,176,706  $5,280,295  $896,411 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Section 1A / Fiscal Constraint Analysis                      
Total Regional Federal Aid Funds Programmed ►  $98,754,989  $98,794,261 ◄Total Budget  $39,272 Target Funds Available              
Section 1A instructions: MPO Template Name) Choose Regional Name from dropdown list to populate header and MPO column; Column C) Enter ID from ProjectInfo; Column E) Choose Municipality Name from dropdown list; Column H) Choose the Funding Source being used for the project - if multiple funding sources are being used enter multiple lines; Column I) Enter the total amount of funds being programmed in this fiscal year and for each funding source; Column J) Federal funds autocalculates. Please verify the amount and only change if needed for flex. Column K) Non-federal funds autocalculates. Please verify the split/match - if matching an FTA flex, coordinate with Rail & Transit Division before programming; Column L) Enter Additional Information as described - please do not use any other format. STP programmed ►  $61,376,260  $80,826,690 ◄ Max STP  $19,450,430 STP available              
HSIP programmed ►  $6,984,151  $4,296,710 ◄ Min. HSIP  $(2,687,441) HSIP recommended met              
CMAQ programmed ►  $20,905,547  $10,741,776 ◄ Min. CMAQ  $(10,163,771) CMAQ recommended met              
TAP programmed ►  $9,489,031  $2,929,085 ◄ Min. TAP  $(6,559,946) TAP amount exceeded!              
Remaining HSIP, CMAQ, and TAP Funds  $39,272                    
►Section 1B / Earmark or Discretionary Grant Funded Projects ►Section 1B / Earmark or Discretionary Grant Funded Projects
             
►Other Federal Aid           ►Other Federal Aid          
  Earmark Discretionary 605789 Boston Region Boston BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD  6 HPP  $5,007,375  $4,005,900  $1,001,475 Construction; HPP 4284 (MA203); STP+Earmarks Total Cost = $24,792,845  605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD   $5,007,375        
  Earmark Discretionary 605789 Boston Region Boston BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD  6 HPP  $2,703,983  $2,163,186  $540,797 Construction; HPP 756 (MA126); STP+Earmarks Total Cost = $24,792,845  605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD   $2,703,983        
  Earmark Discretionary 605789 Boston Region Boston BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD  6 HPP  $6,259,219  $5,007,375  $1,251,844 Construction; (MA154); STP+Earmarks Total Cost = $24,792,845  605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD   $6,259,219        
  Earmark Discretionary 605789 Boston Region Boston BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD  6 HPP  $3,473,764  $2,779,011  $694,753 Construction; (MA194); STP+Earmarks Total Cost = $24,792,845  605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD   $3,473,764        
  Earmark Discretionary 607330 Boston Region Milton MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA 4 HPP  $1,502,213  $1,201,770  $300,443 Construction; (MA125) 607330 MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA  $1,201,770        
  Earmark Discretionary 607330 Boston Region Milton MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA 4 HPP  $1,251,844  $1,001,475  $250,369 Construction; (MA134) 607330 MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA  $1,001,475        
  Earmark Discretionary BN0008 Boston Region Newburyport Parker River National Wildlife Refuge - Replace Hellcat Trail Boardwalk 4 Other FA  $1,200,000  $960,000  $240,000 Transfer to Eastern Federal Lands BN0008 Parker River National Wildlife Refuge - Replace Hellcat Trail Boardwalk  $1,200,000        
  Earmark Discretionary 606316 Boston Region Brookline BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B-27-016, OVER MBTA OFF CARLTON STREET 6 HPP  $751,106  $600,885  $150,221 Demo ID: MA 149

Repurposed earmark, formerly design and construct signal crossing and other safety improvements to Emerald Necklace Greenway Bicycle Trail, Town of Brookline
  BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B-27-016, OVER MBTA OFF CARLTON STREET          
Other Federal Aid subtotal ►  $22,149,502  $17,719,602  $4,429,900 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
               
►Section 2A / State Prioritized Reliability Projects ►Section 2A / State Prioritized Reliability Projects
             
►Bridge Program / Inspections           ►Bridge Program / Inspections          
  Bridge Program Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Bridge Program / Inspections subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / Off-System           ►Bridge Program / Off-System          
  Bridge Program 608079 Boston Region Sharon SHARON- BRIDGE REPLACEMENT, S-09-003 (40N), MASKWONICUT STREET OVER AMTRAK/MBTA 5 STP-BR-OFF  $5,219,900  $4,175,920  $1,043,980 Construction 608079 SHARON- BRIDGE REPLACEMENT, S-09-003 (40N), MASKWONICUT STREET OVER AMTRAK/MBTA  $5,219,900        
  Bridge Program 608255 Boston Region Stow STOW- BRIDGE REPLACEMENT, S-29-011, BOX MILL ROAD OVER ELIZABETH BROOK 3 STP-BR-OFF  $1,482,000  $1,185,600  $296,400 Construction 608255 STOW- BRIDGE REPLACEMENT, S-29-011, BOX MILL ROAD OVER ELIZABETH BROOK  $1,482,000        
Bridge Program / Off-System subtotal ►  $6,701,900  $5,361,520  $1,340,380 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (NHS)           ►Bridge Program / On-System (NHS)          
  Bridge Program 604173 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR 6 NHPP-On  $42,000,000  $33,600,000  $8,400,000 AC Year 3 of 5, Total Cost $144,066,616 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR  $42,000,000        
Bridge Program / On-System (NHS) subtotal ►  $42,000,000  $33,600,000  $8,400,000 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Bridge Program / On-System (Non-NHS)           ►Bridge Program / On-System (Non-NHS)          
  Bridge Program Project # MPO N/A Description District NHPP-Off  $-  $-    $-     Project # Description  $-          
Bridge Program / On-System (Non-NHS) subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / Systematic Maintenance           ►Bridge Program / Systematic Maintenance          
  Bridge Program 608234 Boston Region Multiple BOSTON- RANDOLPH- BRIDGE PRESERVATION OF 3 BRIDGES: B-16-165, R-01-005 & R-01-007 6 NHPP-On  $2,303,571  $1,842,857  $460,714 Construction 608234 BOSTON- RANDOLPH- BRIDGE PRESERVATION OF 3 BRIDGES: B-16-165, R-01-005 & R-01-007  $2,303,571        
Bridge Program / Systematic Maintenance subtotal ►  $2,303,571  $1,842,857  $460,714 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Interstate Pavement           ►Interstate Pavement          
  Interstate Pavement 608219 Boston Region Multiple READING- WAKEFIELD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 4 NHPP  $4,123,392  $3,711,053  $412,339 Construction 608219 READING- WAKEFIELD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95  $4,123,392        
Insterstate Pavement subtotal ►  $4,123,392  $3,711,053  $412,339 ◄ 90% Federal + 10% Non-Federal     Quantified Impact ► #REF!    
             
►Non-Interstate Pavement           ►Non-Interstate Pavement          
  Non-Interstate Pavement 608467 Boston Region Marlborough MARLBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 20 3 NHPP  $9,940,320  $7,952,256  $1,988,064 Construction 608467 MARLBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 20  $9,940,320        
  Non-Interstate Pavement 608468 Boston Region Multiple PEABODY- DANVERS- RESURFACING AND RELATED WORK ON ROUTE 1 4 NHPP  $11,597,040  $9,277,632  $2,319,408 Construction 608468 PEABODY- DANVERS- RESURFACING AND RELATED WORK ON ROUTE 1  $11,597,040        
  Non-Interstate Pavement 608528 Boston Region Multiple WESTON- WALTHAM- RESURFACING AND RELATED WORK ON ROUTE 20 4 NHPP  $12,026,560  $9,621,248  $2,405,312 Construction 608528 WESTON- WALTHAM- RESURFACING AND RELATED WORK ON ROUTE 20  $12,026,560        
  Non-Interstate Pavement 608587 Boston Region Dedham DEDHAM- RECONSTRUCTION & RELATED WORK OF BRIDGE STREET (ROUTE 109) AND AMES STREET 6 NHPP  $5,424,717  $4,339,774  $1,084,943 Construction 608587 DEDHAM- RECONSTRUCTION & RELATED WORK OF BRIDGE STREET (ROUTE 109) AND AMES STREET  $5,424,717        
Non-Interstate Pavement subtotal ►  $38,988,637  $31,190,910  $7,797,727 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
► Roadway Improvements           ► Roadway Improvements          
  Roadway Improvements 608214 Boston Region Winchester WINCHESTER- STORMWATER IMPROVEMENTS ALONG ROUTE 3  4 STP  $232,960  $186,368  $46,592 Construction 608214 WINCHESTER- STORMWATER IMPROVEMENTS ALONG ROUTE 3   $232,960        
  Roadway Improvements 608599 Boston Region Multiple CANTON- SHARON- FOXBOROUGH- NORWOOD-WALPOLE- STORMWATER IMPROVEMENTS ALONG ROUTE 1, ROUTE 1A & INTERSTATE 95 5 STP  $526,235  $420,988  $105,247 Construction 608599 CANTON- SHARON- FOXBOROUGH- NORWOOD-WALPOLE- STORMWATER IMPROVEMENTS ALONG ROUTE 1, ROUTE 1A & INTERSTATE 95  $526,235        
Roadway Improvements subtotal ►  $759,195  $607,356  $151,839 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Safety Improvements           ► Safety Improvements          
  Safety Improvements 608608 Boston Region Braintree BRAINTREE- HIGHWAY LIGHTING IMPROVEMENTS AT I-93/ROUTE 3 INTERCHANGE 6 STP  $7,008,503  $5,606,802  $1,401,701 Construction / Total Project Cost $9,697,229 / AC YR 1 of 2 608608 BRAINTREE- HIGHWAY LIGHTING IMPROVEMENTS AT I-93/ROUTE 3 INTERCHANGE  $7,008,503        
  Safety Improvements 608205 Boston Region Multiple READING TO LYNNFIELD- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-95 (SR 128) 4 HSIP  $4,513,288  $4,061,959  $451,329 Construction 608205 READING TO LYNNFIELD- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-95 (SR 128)  $4,513,288        
  Safety Improvements 608206 Boston Region Multiple CHELSEA TO DANVERS- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US ROUTE 1 4 HSIP  $7,195,084  $6,475,576  $719,508 Construction 608206 CHELSEA TO DANVERS- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US ROUTE 1  $7,195,084        
Safety Improvements subtotal ►  $18,716,875  $16,144,337  $2,572,538 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 2B / State Prioritized Modernization Projects ►Section 2B / State Prioritized Modernization Projects
             
► ADA Retrofits           ► ADA Retrofits          
  ADA Retrofits Project # Statewide Multiple Description 1 STP  $-    $-    $-     Project # Description  $-          
ADA Retrofits subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Intersection Improvements           ►Intersection Improvements          
  Intersection Improvements 607759 Boston Region Boston BOSTON- INTERSECTION & SIGNAL IMPROVEMENTS AT THE VFW PARKWAY & SPRING STREET 6 HSIP  $974,815  $877,334  $97,482 Construction / PSAC score 39 607759 BOSTON- INTERSECTION & SIGNAL IMPROVEMENTS AT THE VFW PARKWAY & SPRING STREET  $974,815        
  Intersection Improvements 607763 Boston Region Milton MILTON- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 138 (BLUE HILL AVENUE) AT ATHERTON STREET & BRADLEE ROAD AND SR 138 (BLUE HILL AVENUE) AT MILTON STREET & DOLLAR LANE 6 HSIP  $1,188,000  $1,069,200  $118,800 Construction / PSAC score 44 607763 MILTON- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 138 (BLUE HILL AVENUE) AT ATHERTON STREET & BRADLEE ROAD AND SR 138 (BLUE HILL AVENUE) AT MILTON STREET & DOLLAR LANE  $1,188,000        
  Intersection Improvements 608052 Boston Region Norwood NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET 5 HSIP  $974,815  $877,334  $97,482 Construction / PSAC score 50 608052 NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET  $974,815        
  Intersection Improvements 607748 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD 3 HSIP  $1,400,000  $1,260,000  $140,000 Construction / PSAC score 58 607748 ACTON- INTERSECTION & SIGNAL IMPROVEMENTS ON SR 2 & SR 111 (MASSACHUSETTS AVENUE) AT PIPER ROAD & TAYLOR ROAD  $1,400,000        
  Intersection Improvements 608755 Boston Region Boston BOSTON- INTERSECTION IMPROVEMENTS AT MORTON STREET AND HARVARD STREET 6 HSIP  $1,500,000  $1,350,000  $150,000 Construction 608755 BOSTON- INTERSECTION IMPROVEMENTS AT MORTON STREET AND HARVARD STREET  $1,500,000        
  Intersection Improvements 607761 Boston Region Swampscott SWAMPSCOTT- INTERSECTION & SIGNAL IMPROVEMENTS AT SR 1A (PARADISE ROAD) AT SWAMPSCOTT MALL 4 HSIP  $2,000,000  $1,800,000  $200,000 Construction / PSAC score 50 607761 SWAMPSCOTT- INTERSECTION & SIGNAL IMPROVEMENTS AT SR 1A (PARADISE ROAD) AT SWAMPSCOTT MALL  $2,000,000        
Intersection Improvements subtotal ►  $8,037,630  $7,233,867  $803,763 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Intelligent Transportation Systems           ►Intelligent Transportation Systems          
  Intelligent Transportation Systems Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Intelligent Transportation System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Roadway Reconstruction           ►Roadway Reconstruction          
  Roadway Reconstruction Project # MPO N/A Description District CMAQ  $-    $-    $-     Project # Description  $-          
Roadway Reconstruction subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Section 2C / State Prioritized Expansion Projects ►Section 2C / State Prioritized Expansion Projects
             
►Bicycles and Pedestrians           ►Bicycles and Pedestrians          
  Bicycles and Pedestrians 607888 Boston Region Multiple BOSTON- BROOKLINE- MULTI-USE PATH CONSTRUCTION ON NEW FENWAY  6 CMAQ  $1,770,722  $1,416,578  $354,144 Construction / PSAC score 41 607888 BOSTON- BROOKLINE- MULTI-USE PATH CONSTRUCTION ON NEW FENWAY   $1,770,722        
  Bicycles and Pedestrians 606223 Boston Region Multiple ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, INCLUDES REPLACING BRIDGE C-19-037, RAIL TRAIL OVER NASHOBA BROOK, NEW BRIDGE C-19-039, RAIL TRAIL OVER ROUTE 2 & NEW CULVERT C-19-040, ROUTE 2 OVER WILDLIFE CROSSING (PHASE II-B) 4 CMAQ  $9,495,746  $7,596,597  $1,899,149 Construction / PSAC score 31.5 606223 ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, INCLUDES REPLACING BRIDGE C-19-037, RAIL TRAIL OVER NASHOBA BROOK, NEW BRIDGE C-19-039, RAIL TRAIL OVER ROUTE 2 & NEW CULVERT C-19-040, ROUTE 2 OVER WILDLIFE CROSSING (PHASE II-B)  $9,495,746        
Bicycles and Pedestrians 606316 Boston Region Brookline BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B-27-016, OVER MBTA OFF CARLTON STREET 6 CMAQ  $3,087,238  $2,469,790  $617,448 Construction / Total Project Cost $3,838,344 w/ additional funding from earmark at $751,106              
Bicycles and Pedestrians subtotal ►  $11,266,468  $9,013,174  $2,253,294 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Capacity           ►Capacity          
  Capacity Project # MPO Municipalities Description District CMAQ  $-    $-    $-     Project # Description  $-          
Capacity subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 3 / Planning / Adjustments / Pass-throughs ►Section 3 / Planning / Adjustments / Pass-throughs
             
►Planning / Adjustments / Pass-throughs           ►Planning / Adjustments / Pass-throughs          
  Planning / Adjustments / Pass-throughs Project # Statewide Multiple ABP GANS Repayment  Multiple NHPP  $-    $-    $-     Project # ABP GANS Repayment   $-          
Other Statewide Items subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
             
►Section 4 / Non-Federally Aided Projects ►Section 2A / Non-Federal Projects
             
►Non-Federally Aided Projects           ►Non-Federally Aided Projects          
  Non Federal Aid Project # MPO Municipalities Description District NFA  $-      $-     Project # Description  $-          
Non-Federal Aid subtotal►  $-      $-   ◄100% Non-Federal     Quantified Impact ► #REF!    
             
2019 Summary TIP Section 1 - 3: ▼ TIP Section 4: ▼ Total of All Projects ▼     2018 X Region MPO GHG Tracking Summary Total Quantified Impact ▼    
Total ►  $161,223,876  $-    $161,223,876 ◄ Total Spending in Region     Quantified Impact ► #REF!    
Federal Funds ►  $131,704,971    $131,704,971 ◄ Total Federal Spending in Region              
Non-Federal Funds ►  $29,518,906  $-    $29,518,906 ◄ Total Non-Federal Spending in Region              
701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008.  Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road.  The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority.  For all projects contained in the TIP, the Commonwealth is the Awarding Authority.  Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation.   This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website:  http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

Transportation Improvement Program (TIP)
Project List (FY2019)
FTA Program Project Number Transit Agency FTA Activity Line Item Project Description Carryover (unobligated) Federal Funds State Funds TDC Local Funds Total Cost
5307                    
5307 RTD0005466 Cape Ann Transportation Authority 117A00 PREVENTIVE MAINTENANCE 2017 - $92,000; 2018 - $450,000 $542,000 $0 $0 $135,500 $677,500
5307 RTD0005470 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQ/COMPUTER/SFTWR 2018 - $44,000 $44,000 $11,000 $0 $0 $55,000
5307 RTD0005471 Cape Ann Transportation Authority 114220 ACQUIRE - MISC SUPPORT EQUIPMENT 2018 - $30,055 $30,055 $7,514 $0 $0 $37,569
5307 RTD0005993 MetroWest Regional Transit Authority 113303 TERMINAL, INTERMODAL (TRANSIT): Facil. Improvements 2018 - $150,000 $150,000 $37,500 $0 $0 $187,500
5307 RTD0005994 MetroWest Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV 2018 - $1,300,000 $1,300,000 $325,000 $0 $0 $1,625,000
5307 RTD0005995 MetroWest Regional Transit Authority 114200 ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 2018 - $248,415 $248,415 $62,104 $0 $0 $310,519
5307 RTD0005996 MetroWest Regional Transit Authority 440000 Mobility Management 2018 - $25,000 $25,000 $6,250 $0 $0 $31,250
5307 RTD0006356 Massachusetts Bay Transportation Authority (MBTA) 121200 Revenue Vehicle Program $112,000,000 $0 $0 $28,000,000 $140,000,000
5307 RTD0006357 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $31,445,210 $0 $0 $7,861,303 $39,306,513
          Subtotal $145,784,680 $449,368 $0 $35,996,803 $182,230,851
5309                    
5309 RTD0005979 Massachusetts Bay Transportation Authority (MBTA) 132303 Green Line Extension Project $150,000,000 $0 $0 $147,848,038 $297,848,038
          Subtotal $150,000,000 $0 $0 $147,848,038 $297,848,038
5310                    
          Subtotal $0 $0 $0 $0 $0
5311                    
          Subtotal $0 $0 $0 $0 $0
5337                    
5337 RTD0006358 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $136,853,672 $0 $0 $34,213,418 $171,067,090
5337 RTD0006359 Massachusetts Bay Transportation Authority (MBTA) 124400 System Upgrades Program 2018 - $8,000,000 $8,000,000 $0 $0 $2,000,000 $10,000,000
          Subtotal $144,853,672 $0 $0 $36,213,418 $181,067,090
5339                    
5339 RTD0006360 Massachusetts Bay Transportation Authority (MBTA) 111400 Bus Program $5,434,322 $0 $0 $1,358,581 $6,792,903
          Subtotal $5,434,322 $0 $0 $1,358,581 $6,792,903
5320                    
          Subtotal $0 $0 $0 $0 $0
Other Federal                    
          Subtotal $0 $0 $0 $0 $0
Other Non-Federal                    
Other Non-Federal RTD0006089 Cape Ann Transportation Authority 111209 BUY REPLACEMENT TROLLEY BUS $0 $900,000 $0 $0 $900,000
          Subtotal $0 $900,000 $0 $0 $900,000
          Total $446,072,674 $1,349,368 $0 $221,416,840 $668,838,882

 

2020 Boston Region Transportation Improvement Program       2020 GHG Tracking for Boston Region Transportation Improvement Program
     
Amendment /
Adjustment Type ▼
STIP                             Program ▼ MassDOT Project ID Metropolitan Planning Organization ▼ Municipality Name ▼ MassDOT                                                                                                              Project                                                                                               Description MassDOT  District Funding                       Source Total Programmed                Funds Federal                    Funds Non-Federal                        Funds Additional Information ▼                                   Present information as follows, if applicable: a) Planning / Design / or Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information MassDOT Project ID MassDOT                                                                                                              Project Description Total Programmed                Funds GHG        Analysis  Type GHG CO2 Impact (kg/yr) GHG                                                                          Impact Description Additional                                                                          Description
             
►Section 1A / Regionally Prioritized Projects ►Section 1A / Regionally Prioritized Projects
             
►Regionally Prioritized Projects           ►Regionally Prioritized Projects          
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 CMAQ  $13,427,220  $10,741,776  $2,685,444 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 5 of 6; funding flexed to FTA; match provided by local
contributions
1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR  $13,427,220        
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 STP  $21,872,780  $17,498,224  $4,374,556 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 5 of 6; funding flexed to FTA; match provided by local
contributions
1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR  $21,872,780        
  Roadway reconstruction program 604123 Boston Region Ashland ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. 3 CMAQ  $1,000,000  $800,000  $200,000 Construction; STP+CMAQ+TAP Total Cost = $14,636,338; MPO Evaluation Score = 54              
  Roadway reconstruction program 604123 Boston Region Ashland ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. 3 TAP  $2,106,481  $1,685,185  $421,296 Construction; STP+CMAQ+TAP Total Cost = $14,636,338; MPO Evaluation Score = 54              
  Roadway reconstruction program 604123 Boston Region Ashland ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. 3 STP  $11,529,857  $9,223,886  $2,305,971 Construction; STP+CMAQ+TAP Total Cost = $14,636,338; MPO Evaluation Score = 54              
  Roadway reconstruction program 602077 Boston Region Lynn LYNN- RECONSTRUCTION ON ROUTE 129 (LYNNFIELD STREET), FROM GREAT WOODS ROAD TO WYOMA SQUARE  4 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+STP Total Cost = $4,755,714; MPO Evaluation Score = 38              
  Roadway reconstruction program 602077 Boston Region Lynn LYNN- RECONSTRUCTION ON ROUTE 129 (LYNNFIELD STREET), FROM GREAT WOODS ROAD TO WYOMA SQUARE  4 STP  $3,755,714  $3,004,571  $751,143 Construction; CMAQ+STP Total Cost = $4,755,714; MPO Evaluation Score = 38              
  Roadway reconstruction program 602261 Boston Region Walpole WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER 5 CMAQ  $1,000,000  $800,000  $200,000 Construction; STP+CMAQ+TAP Total Cost = $17,390,216; MPO Evaluation Score = 51              
  Roadway reconstruction program 602261 Boston Region Walpole WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER 5 TAP  $1,858,437  $1,486,750  $371,687 Construction; STP+CMAQ+TAP Total Cost = $17,390,216; MPO Evaluation Score = 51              
  Roadway reconstruction program 602261 Boston Region Walpole WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER 5 STP  $14,531,779  $11,625,423  $2,906,356 Construction; STP+CMAQ+TAP Total Cost = $17,390,216; MPO Evaluation Score = 51              
  Roadway reconstruction program 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET  6 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+TAP+STP Total Cost = $8,214,319; MPO Evaluation Score = 58              
  Roadway reconstruction program 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET  6 TAP  $812,432  $649,946  $162,486 Construction; CMAQ+TAP+STP Total Cost = $8,214,319; MPO Evaluation Score = 58              
  Roadway reconstruction program 606453 Boston Region Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH STREET  6 STP  $6,401,887  $5,121,510  $1,280,377 Construction; CMAQ+TAP+STP Total Cost = $8,214,319; MPO Evaluation Score = 58              
  Roadway reconstruction program 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STP  $7,000,000  $5,600,000  $1,400,000 Construction; TAP+STP Total Cost = $152,000,000; AC Yr 1 of 5; Total funding in this TIP = $76,626,515              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON) 6 HSIP  $2,319,644  $2,087,680  $231,964 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 2 of 2; MPO Evaluation Score = 75              
  Roadway reconstruction program 606635 Boston Region Multiple NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON) 6 STP  $8,397,556  $6,718,045  $1,679,511 Construction; CMAQ+HSIP+TAP+STP Total Cost = $21,434,400; AC Yr 2 of 2; MPO Evaluation Score = 75 606635 NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON)  $8,397,556        
Regionally Prioritized Projects subtotal ►  $98,013,787  $78,642,994  $19,370,793 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Section 1A / Fiscal Constraint Analysis                      
Total Regional Federal Aid Funds Programmed ►  $98,013,787  $98,029,447 ◄Total Budget  $15,660 Target Funds Available              
Section 1A instructions: MPO Template Name) Choose Regional Name from dropdown list to populate header and MPO column; Column C) Enter ID from ProjectInfo; Column E) Choose Municipality Name from dropdown list; Column H) Choose the Funding Source being used for the project - if multiple funding sources are being used enter multiple lines; Column I) Enter the total amount of funds being programmed in this fiscal year and for each funding source; Column J) Federal funds autocalculates. Please verify the amount and only change if needed for flex. Column K) Non-federal funds autocalculates. Please verify the split/match - if matching an FTA flex, coordinate with Rail & Transit Division before programming; Column L) Enter Additional Information as described - please do not use any other format. STP programmed ►  $73,489,573  $80,061,875 ◄ Max STP  $6,572,302 STP available              
HSIP programmed ►  $2,319,644  $4,296,710 ◄ Min. HSIP  $1,977,066 HSIP recommended not met              
CMAQ programmed ►  $17,427,220  $10,741,776 ◄ Min. CMAQ  $(6,685,444) CMAQ recommended met              
TAP programmed ►  $4,777,350  $2,929,085 ◄ Min. TAP  $(1,848,265) TAP amount exceeded!              
Remaining HSIP, CMAQ, and TAP Funds  $15,660                    
►Section 1B / Earmark or Discretionary Grant Funded Projects ►Section 1B / Earmark or Discretionary Grant Funded Projects
             
►Other Federal Aid           ►Other Federal Aid          
  Earmark Discretionary Project # Boston Municipalities Description District HPP  $-    $-    $-     Project # Description  $-          
  Earmark Discretionary Project # Boston Municipalities Description District HPP  $-    $-    $-     Project # Description  $-          
Other Federal Aid subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
               
►Section 2A / State Prioritized Reliability Projects ►Section 2A / State Prioritized Reliability Projects
             
►Bridge Program / Inspections           ►Bridge Program / Inspections          
  Bridge Program Project # N/A Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Bridge Program / Inspections subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / Off-System           ►Bridge Program / Off-System          
  Bridge Program Project # MPO N/A Description District STP-BR-OFF  $-  $-    $-     Project # Description  $-          
Bridge Program / Off-System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (NHS)           ►Bridge Program / On-System (NHS)          
  Bridge Program 605342 Boston Region Stow STOW- BRIDGE REPLACEMENT, S-29-001, (ST 62) GLEASONDALE ROAD OVER THE ASSABET RIVER 3 NHPP-On  $6,706,560  $5,365,248  $1,341,312 Construction 605342 STOW- BRIDGE REPLACEMENT, S-29-001, (ST 62) GLEASONDALE ROAD OVER THE ASSABET RIVER  $6,706,560        
  Bridge Program 608614 Boston Region Boston BOSTON- BRIDGE PRESERVATION, B-16-179, AUSTIN STREET OVER I-93 RAMPS, MBTA COMMUTER RAIL AND ORANGE LINE  6 NHPP-On  $20,606,400  $16,485,120  $4,121,280 Construction 608614 BOSTON- BRIDGE PRESERVATION, B-16-179, AUSTIN STREET OVER I-93 RAMPS, MBTA COMMUTER RAIL AND ORANGE LINE   $20,606,400        
  Bridge Program 604173 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR 6 NHPP-On  $35,000,000  $28,000,000  $7,000,000 Construction / AC Year 4 of 5, Total Cost $144,066,616 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR  $35,000,000        
Bridge Program / On-System (NHS) subtotal ►  $62,312,960  $49,850,368  $12,462,592 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Bridge Program / On-System (Non-NHS)           ►Bridge Program / On-System (Non-NHS)          
  Bridge Program 608009 Boston Region Boxborough BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495 3 NHPP-Off  $9,147,500  $7,318,000  $1,829,500 AC Year 1 of 2, Total Cost $14,295,000 608009 BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495  $9,147,500        
Bridge Program / On-System (Non-NHS) subtotal ►  $9,147,500  $7,318,000  $1,829,500 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Bridge Program / Systematic Maintenance           ►Bridge Program / Systematic Maintenance          
  Bridge Program 608596 Boston Region Essex ESSEX- SUPERSTRUCTURE REPLACEMENT, E-11-001 (2TV), ROUTE 133\MAIN STREET OVER ESSEX RIVER 4 NHPP-Off  $2,400,000  $1,920,000  $480,000   608596 ESSEX- SUPERSTRUCTURE REPLACEMENT, E-11-001 (2TV), ROUTE 133\MAIN STREET OVER ESSEX RIVER  $2,400,000        
Bridge Program / Systematic Maintenance subtotal ►  $2,400,000  $1,920,000  $480,000 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Interstate Pavement           ►Interstate Pavement          
  Interstate Pavement 608208 Boston Region Multiple QUINCY- MILTON- BOSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 6 NHPP  $24,264,576  $21,838,118  $2,426,458 Construction / Includes $540,000 of stormwater improvements 608208 QUINCY- MILTON- BOSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-93  $24,264,576        
Insterstate Pavement subtotal ►  $24,264,576  $21,838,118  $2,426,458 ◄ 90% Federal + 10% Non-Federal     Quantified Impact ► #REF!    
             
►Non-Interstate Pavement           ►Non-Interstate Pavement          
  Non-Interstate Pavement 608480 Boston Region Multiple FOXBOROUGH- WALPOLE- RESURFACING AND RELATED WORK ON ROUTE 1 5 NHPP  $8,063,129  $6,450,503  $1,612,626 Construction 608480 FOXBOROUGH- WALPOLE- RESURFACING AND RELATED WORK ON ROUTE 1  $8,063,129        
  Non-Interstate Pavement 608484 Boston Region Multiple CANTON- MILTON- RESURFACING AND RELATED WORK ON ROUTE 138 6 NHPP  $15,343,776  $12,275,021  $3,068,755 Construction 608484 CANTON- MILTON- RESURFACING AND RELATED WORK ON ROUTE 138  $15,343,776        
  Non-Interstate Pavement 608482 Boston Region Multiple CAMBRIDGE- SOMERVILLE- RESURFACING AND RELATED WORK ON ROUTE 28 6 NHPP  $7,761,096  $6,208,877  $1,552,219 Construction 608482 CAMBRIDGE- SOMERVILLE- RESURFACING AND RELATED WORK ON ROUTE 28  $7,761,096        
Non-Interstate Pavement subtotal ►  $31,168,001  $24,934,401  $6,233,600 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
► Roadway Improvements           ► Roadway Improvements          
  Roadway Improvements Project # MPO N/A Description District STP  $-    $-    $-     Project # Description  $-          
Roadway Improvements subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Safety Improvements           ► Safety Improvements          
  Safety Improvements 608608 Boston Region Braintree BRAINTREE- HIGHWAY LIGHTING IMPROVEMENTS AT I-93/ROUTE 3 INTERCHANGE 6 STP  $2,688,726  $2,150,981  $537,745 Construction / Total Project Cost $9,697,229 / AC YR 2 of 2 608608 BRAINTREE- HIGHWAY LIGHTING IMPROVEMENTS AT I-93/ROUTE 3 INTERCHANGE  $2,688,726        
  Safety Improvements 608611 Boston Region Multiple CANTON- MILTON- RANDOLPH- REPLACEMENT AND REHABILITATION OF THE HIGHWAY LIGHTING SYSTEM AT THE ROUTE 24/ROUTE 1/I-93 INTERCHANGE 6 HSIP  $9,434,070  $8,490,663  $943,407 Construction 608611 CANTON- MILTON- RANDOLPH- REPLACEMENT AND REHABILITATION OF THE HIGHWAY LIGHTING SYSTEM AT THE ROUTE 24/ROUTE 1/I-93 INTERCHANGE  $9,434,070        
Safety Improvements subtotal ►  $12,122,796  $10,641,644  $1,481,152 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 2B / State Prioritized Modernization Projects ►Section 2B / State Prioritized Modernization Projects
             
► ADA Retrofits           ► ADA Retrofits          
  ADA Retrofits Project # MPO Municipalities Description District STP  $-    $-    $-     Project # Description  $-          
ADA Retrofits subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Intersection Improvements           ►Intersection Improvements          
  Intersection Improvements 608562 Boston Region Somerville SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) 4 HSIP  $2,688,000  $2,419,200  $268,800 Construction / PSAC score 68 608562 SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION)  $2,688,000        
  Intersection Improvements 608564 Boston Region Watertown WATERTOWN- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND GALEN STREET 6 HSIP  $2,688,000  $2,419,200  $268,800 Construction / PSAC score 56 608564 WATERTOWN- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND GALEN STREET  $2,688,000        
Intersection Improvements subtotal ►  $5,376,000  $4,838,400  $537,600 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Intelligent Transportation Systems           ►Intelligent Transportation Systems          
  Intelligent Transportation Systems Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Intelligent Transportation System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Roadway Reconstruction           ►Roadway Reconstruction          
  Roadway Reconstruction 608835 Boston Region Medford MEDFORD- IMPROVEMENTS AT BROOKS ELEMENTARY SCHOOL (SRTS) 4 TAP  $1,200,000  $960,000  $240,000 Construction / TAP project proponent is Medford 608835 MEDFORD- IMPROVEMENTS AT BROOKS ELEMENTARY SCHOOL (SRTS)  $1,200,000        
  Roadway Reconstruction 608743 Boston Region Salem SALEM- IMPROVEMENTS AT BATES ELEMENTARY SCHOOL (SRTS) 4 TAP  $937,500  $750,000  $187,500 Construction / TAP project proponent is Salem 608743 SALEM- IMPROVEMENTS AT BATES ELEMENTARY SCHOOL (SRTS)  $937,500        
  Roadway Reconstruction 608829 Boston Region Stoughton STOUGHTON - IMPROVEMENTS AT WEST ELEMENTARY SCHOOL (SRTS) 5 TAP  $2,226,600  $1,781,280  $445,320 Construction / TAP project proponent is Stoughton 608829 STOUGHTON - IMPROVEMENTS AT WEST ELEMENTARY SCHOOL (SRTS)  $2,226,600        
  Roadway Reconstruction 608791 Boston Region Winchester WINCHESTER- IMPROVEMENTS AT VINSON-OWEN ELEMENTARY SCHOOL (SRTS) 4 TAP  $1,666,200  $1,332,960  $333,240 Construction / TAP project proponent is Winchester 608791 WINCHESTER- IMPROVEMENTS AT VINSON-OWEN ELEMENTARY SCHOOL (SRTS)  $1,666,200        
  Roadway Reconstruction 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP  $1,000,000  $800,000  $200,000 Construction / Total Project Cost = $270,000,000 / AC YR 1 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $1,000,000        
Roadway Reconstruction subtotal ►  $7,030,300  $5,624,240  $1,406,060 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Section 2C / State Prioritized Expansion Projects ►Section 2C / State Prioritized Expansion Projects
             
►Bicycles and Pedestrians           ►Bicycles and Pedestrians          
  Bicycles and Pedestrians Project # MPO N/A Description District CMAQ  $-    $-    $-     Project # Description  $-          
Bicycles and Pedestrians subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Capacity           ►Capacity          
  Capacity Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Capacity subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Section 3 / Planning / Adjustments / Pass-throughs ►Section 3 / Planning / Adjustments / Pass-throughs
             
►Planning / Adjustments / Pass-throughs           ►Planning / Adjustments / Pass-throughs          
  Planning / Adjustments / Pass-throughs Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Other Statewide Items subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
             
►Section 4 / Non-Federally Aided Projects ►Section 2A / Non-Federal Projects
             
►Non-Federally Aided Projects           ►Non-Federally Aided Projects          
  Non Federal Aid 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA  $18,112,483    $18,112,483 Construction / Total Project Cost = $270,000,000 / AC YR 1 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $18,112,483        
Non-Federal Aid subtotal►  $18,112,483    $18,112,483 ◄100% Non-Federal     Quantified Impact ► #REF!    
             
2020 Summary TIP Section 1 - 3: ▼ TIP Section 4: ▼ Total of All Projects ▼     2018 X Region MPO GHG Tracking Summary Total Quantified Impact ▼    
Total ►  $251,835,920  $18,112,483  $269,948,403 ◄ Total Spending in Region     Quantified Impact ► #REF!    
Federal Funds ►  $205,608,165    $205,608,165 ◄ Total Federal Spending in Region              
Non-Federal Funds ►  $46,227,755  $18,112,483  $64,340,238 ◄ Total Non-Federal Spending in Region              
701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008.  Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road.  The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority.  For all projects contained in the TIP, the Commonwealth is the Awarding Authority.  Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation.   This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website:  http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

Transportation Improvement Program (TIP)
Project List (FY2020)
FTA Program Project Number Transit Agency FTA Activity Line Item Project Description Carryover (unobligated) Federal Funds State Funds TDC Local Funds Total Cost
5307                    
5307 RTD0005472 Cape Ann Transportation Authority 117A00 PREVENTIVE MAINTENANCE 2019 - $350,000 $350,000 $0 $0 $87,500 $437,500
5307 RTD0005477 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQ/COMP/SFTWR 2019 - $40,000 $40,000 $10,000 $0 $0 $50,000
5307 RTD0005478 Cape Ann Transportation Authority 114220 ACQUIRE - MISC SUPPORT EQUIPMENT 2019 - $11,296 $11,296 $2,824 $0 $0 $14,120
5307 RTD0005997 MetroWest Regional Transit Authority 114200 ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 2019 - $248,415 $248,415 $62,104 $0 $0 $310,519
5307 RTD0005998 MetroWest Regional Transit Authority 440000 Mobility Management 2019 - $25,000 $25,000 $6,250 $0 $0 $31,250
5307 RTD0005999 MetroWest Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV 2019 - $1,300,000 $1,300,000 $325,000 $0 $0 $1,625,000
5307 RTD0006000 MetroWest Regional Transit Authority 113303 TERMINAL, INTERMODAL (TRANSIT) 2019 - $150,000 $150,000 $37,500 $0 $0 $187,500
5307 RTD0006361 Massachusetts Bay Transportation Authority (MBTA) 121200 Revenue Vehicle Program $40,000,000 $0 $0 $10,000,000 $50,000,000
5307 RTD0006362 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $44,000,000 $0 $0 $11,000,000 $55,000,000
5307 RTD0006363 Massachusetts Bay Transportation Authority (MBTA) 126301 Systemwide Signals Program $61,840,976 $0 $0 $15,460,244 $77,301,220
          Subtotal $147,965,687 $443,678 $0 $36,547,744 $184,957,109
5309                    
5309 RTD0005987 Massachusetts Bay Transportation Authority (MBTA) 132303 Green Line Extension Project $150,000,000 $0 $0 $147,848,038 $297,848,038
          Subtotal $150,000,000 $0 $0 $147,848,038 $297,848,038
5310                    
          Subtotal $0 $0 $0 $0 $0
5311                    
          Subtotal $0 $0 $0 $0 $0
5337                    
5337 RTD0006364 Massachusetts Bay Transportation Authority (MBTA) 122405 Bridge & Tunnel Program $24,000,000 $0 $0 $6,000,000 $30,000,000
5337 RTD0006365 Massachusetts Bay Transportation Authority (MBTA) 123402 Elevator Program $48,000,000 $0 $0 $12,000,000 $60,000,000
5337 RTD0006366 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $47,347,989 $0 $0 $11,836,997 $59,184,986
5337 RTD0006367 Massachusetts Bay Transportation Authority (MBTA) 124400 System Upgrades Program $28,000,000 $0 $0 $7,000,000 $35,000,000
          Subtotal $147,347,989 $0 $0 $36,836,997 $184,184,986
5339                    
5339 RTD0006368 Massachusetts Bay Transportation Authority (MBTA) 111400 Bus Program $5,552,214 $0 $0 $1,388,053 $6,940,267
          Subtotal $5,552,214 $0 $0 $1,388,053 $6,940,267
5320                    
          Subtotal $0 $0 $0 $0 $0
Other Federal                    
          Subtotal $0 $0 $0 $0 $0
Other Non-Federal                    
          Subtotal $0 $0 $0 $0 $0
          Total $450,865,890 $443,678 $0 $222,620,832 $673,930,400

 

2021 Boston Region Transportation Improvement Program       2021 GHG Tracking for Boston Region Transportation Improvement Program
     
Amendment /
Adjustment Type ▼
STIP                             Program ▼ MassDOT Project ID Metropolitan Planning Organization ▼ Municipality Name ▼ MassDOT                                                                                                              Project                                                                                               Description MassDOT  District Funding                       Source Total Programmed                Funds Federal                    Funds Non-Federal                        Funds Additional Information ▼                                   Present information as follows, if applicable: a) Planning / Design / or Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information MassDOT Project ID MassDOT                                                                                                              Project Description Total Programmed                Funds GHG        Analysis  Type GHG CO2 Impact (kg/yr) GHG                                                                          Impact Description Additional                                                                          Description
             
►Section 1A / Regionally Prioritized Projects ►Section 1A / Regionally Prioritized Projects
             
►Regionally Prioritized Projects           ►Regionally Prioritized Projects          
  Roadway reconstruction program 608228 Boston Region Framingham FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET 3 HSIP  $1,509,587  $1,358,628  $150,959 Construction; STP+HSIP+TAP Total Cost = $10,304,881; MPO Evaluation Score = 58 608228 FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET  $1,509,587        
  Roadway reconstruction program 608228 Boston Region Framingham FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET 3 TAP  $1,006,391  $805,113  $201,278 Construction; STP+HSIP+TAP Total Cost = $10,304,881; MPO Evaluation Score = 58 608228 FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET  $1,006,391        
  Roadway reconstruction program 608228 Boston Region Framingham FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET 3 STP  $7,788,903  $6,231,122  $1,557,781 Construction; STP+HSIP+TAP Total Cost = $10,304,881; MPO Evaluation Score = 58 608228 FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET          
  Intersection improvements program 606130 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET 5 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+STP Total Cost = $3,668,437; MPO Evaluation Score = 53 606130 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET          
  Intersection improvements program 606130 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET 5 STP  $2,668,437  $2,134,750  $533,687 Construction; CMAQ+STP Total Cost = $3,668,437; MPO Evaluation Score = 53 606130 NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET          
  Planning / Adjustments / Pass-throughs 608347 Boston Region Beverly BEVERLY- INTERSECTION IMPROVEMENTS @ 3 LOCATIONS: CABOT STREET (ROUTE 1A/97) @ DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY STREET @ BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS 4 HSIP  $2,339,729  $2,105,756  $233,973 Construction; HSIP+CMAQ Total Cost = $3,360,000; MPO Evaluation Score = 63 608347 BEVERLY- INTERSECTION IMPROVEMENTS @ 3 LOCATIONS: CABOT STREET (ROUTE 1A/97) @ DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY STREET @ BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS          
  Planning / Adjustments / Pass-throughs 608347 Boston Region Beverly BEVERLY- INTERSECTION IMPROVEMENTS @ 3 LOCATIONS: CABOT STREET (ROUTE 1A/97) @ DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY STREET @ BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS 4 CMAQ  $1,020,271  $816,217  $204,054 Construction; HSIP+CMAQ Total Cost = $3,360,000; MPO Evaluation Score = 63 608347 BEVERLY- INTERSECTION IMPROVEMENTS @ 3 LOCATIONS: CABOT STREET (ROUTE 1A/97) @ DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY STREET @ BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS          
  Planning / Adjustments / Pass-throughs BN0009 Boston Region Multiple COMMUNITY TRANSPORTATION PROGRAM NA CMAQ  $1,000,000  $800,000  $200,000 Planning, Design, or Construction; Set Aside for LRTP Clean Air and Mobility Program BN0009 COMMUNITY TRANSPORTATION PROGRAM          
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 CMAQ  $10,000,000  $8,000,000  $2,000,000 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 6 of 6; funding flexed to FTA; match provided by local
contributions
1570 GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR  $10,000,000        
  Planning / Adjustments / Pass-throughs 1570 Boston Region Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 STP  $19,700,000  $15,760,000  $3,940,000 Construction; STP+CMAQ+Section 5309 (Transit) Total MPO Contribution = $190,000,000; AC Yr 6 of 6; funding flexed to FTA; match provided by local
contributions
             
  Roadway reconstruction program 606501 Boston Region Holbrook HOLBROOK- RECONSTRUCTION OF UNION STREET (ROUTE 139), FROM LINFIELD STREET TO CENTRE STREET/WATER STREET 5 TAP  $289,088  $231,270  $57,818 Construction; TAP+STP+Earmark Total Cost = $2,890,880; MPO Evaluation Score = 45              
  Roadway reconstruction program 606501 Boston Region Holbrook HOLBROOK- RECONSTRUCTION OF UNION STREET (ROUTE 139), FROM LINFIELD STREET TO CENTRE STREET/WATER STREET 5 STP  $1,074,542  $859,634  $214,908 Construction; TAP+STP+Earmark Total Cost = $2,890,880; MPO Evaluation Score = 45              
  Roadway reconstruction program 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP  $2,183,253  $1,746,602  $436,651 Construction; TAP+STP Total Cost = $152,000,000; AC Yr 2 of 5; Total funding in this TIP = $76,500,000              
  Roadway reconstruction program 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STP  $24,997,494  $19,997,995  $4,999,499 Construction; TAP+STP Total Cost = $152,000,000; AC Yr 2 of 5; Total funding in this TIP = $76,626,515              
  Bridge Program 604996 Boston Region Woburn WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA 4 STP  $17,026,434  $13,621,147  $3,405,287 Construction; Total Cost = $17,026,434; MPO Evaluation Score = 55              
  Roadway reconstruction program 601607 Boston Region Hull HULL- RECONSTRUCTION OF ATLANTIC AVENUE AND RELATED WORK FROM NANTASKET AVENUE TO COHASSET TOWN LINE  5 STP  $6,693,980  $5,355,184  $1,338,796 Construction; Total Cost = $6,693,980; MPO Evaluation Score = 44 601607 HULL- RECONSTRUCTION OF ATLANTIC AVENUE AND RELATED WORK FROM NANTASKET AVENUE TO COHASSET TOWN LINE   $6,693,980        
Regionally Prioritized Projects subtotal ►  $100,298,109  $80,623,419  $19,674,690 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Section 1A / Fiscal Constraint Analysis                      
Total Regional Federal Aid Funds Programmed ►  $100,298,109  $100,298,110 ◄Total Budget  $1 Target Funds Available              
Section 1A instructions: MPO Template Name) Choose Regional Name from dropdown list to populate header and MPO column; Column C) Enter ID from ProjectInfo; Column E) Choose Municipality Name from dropdown list; Column H) Choose the Funding Source being used for the project - if multiple funding sources are being used enter multiple lines; Column I) Enter the total amount of funds being programmed in this fiscal year and for each funding source; Column J) Federal funds autocalculates. Please verify the amount and only change if needed for flex. Column K) Non-federal funds autocalculates. Please verify the split/match - if matching an FTA flex, coordinate with Rail & Transit Division before programming; Column L) Enter Additional Information as described - please do not use any other format. STP programmed ►  $79,949,790  $82,330,538 ◄ Max STP  $2,380,748 STP available              
HSIP programmed ►  $3,849,316  $4,296,710 ◄ Min. HSIP  $447,394 HSIP recommended not met              
CMAQ programmed ►  $13,020,271  $10,741,776 ◄ Min. CMAQ  $(2,278,495) CMAQ recommended met              
TAP programmed ►  $3,478,732  $2,929,085 ◄ Min. TAP  $(549,647) TAP amount exceeded!              
Remaining HSIP, CMAQ, and TAP Funds  $1                    
►Section 1B / Earmark or Discretionary Grant Funded Projects ►Section 1B / Earmark or Discretionary Grant Funded Projects
             
►Other Federal Aid           ►Other Federal Aid          
  Earmark Discretionary 606226 Boston Region Municipalities BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 HPP  $126,970  $101,576  $25,394 Demo ID MA183 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE  $126,970        
  Earmark Discretionary 606226 Boston Region Municipalities BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 HPP  $8,451,960  $6,761,568  $1,690,392 Demo ID MA210 606226 BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE  $8,451,960        
  Earmark Discretionary 606501 Boston Region Municipalities HOLBROOK- RECONSTRUCTION OF UNION STREET (ROUTE 139), FROM LINFIELD STREET TO CENTRE STREET/WATER STREET 5 HPP  $1,527,250  $1,221,800  $305,450 Demo ID MA177 606501 HOLBROOK- RECONSTRUCTION OF UNION STREET (ROUTE 139), FROM LINFIELD STREET TO CENTRE STREET/WATER STREET  $1,527,250        
Other Federal Aid subtotal ►  $10,106,180  $8,084,944  $2,021,236 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
               
►Section 2A / State Prioritized Reliability Projects ►Section 2A / State Prioritized Reliability Projects
             
►Bridge Program / Inspections           ►Bridge Program / Inspections          
  Bridge Program Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Bridge Program / Inspections subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / Off-System           ►Bridge Program / Off-System          
  Bridge Program 608637 Boston Region Maynard MAYNARD- BRIDGE REPLACMENT, M-10-006, CARRYING FLORIDA ROAD OVER THE ASSABET RIVER 3 STP-BR-OFF  $1,589,840  $1,271,872  $317,968 Construction 608637 MAYNARD- BRIDGE REPLACMENT, M-10-006, CARRYING FLORIDA ROAD OVER THE ASSABET RIVER  $1,589,840        
Bridge Program / Off-System subtotal ►  $1,589,840  $1,271,872  $317,968 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (NHS)           ►Bridge Program / On-System (NHS)          
  Bridge Program 608703 Boston Region Wilmington WILMINGTON- BRIDGE REPLACEMENT, W-38-029 (2KV), ST 129 LOWELL STREET OVER I 93 4 NHPP-On  $16,546,880  $13,237,504  $3,309,376 Construction 608703 WILMINGTON- BRIDGE REPLACEMENT, W-38-029 (2KV), ST 129 LOWELL STREET OVER I 93  $16,546,880        
  Bridge Program 607327 Boston Region Wilmington WILMINGTON- BRIDGE REPLACEMENT, W-38-002, ROUTE 38 (MAIN STREET) OVER THE B&M RAILROAD 4 NHPP-On  $10,760,960  $8,608,768  $2,152,192 Construction 607327 WILMINGTON- BRIDGE REPLACEMENT, W-38-002, ROUTE 38 (MAIN STREET) OVER THE B&M RAILROAD  $10,760,960        
  Bridge Program 604173 Boston Region Boston BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR 6 NHPP-On  $18,666,616  $14,933,293  $3,733,323 Construction / AC Year 5 of 5, Total Cost $144,066,616 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR  $18,666,616        
Bridge Program / On-System (NHS) subtotal ►  $45,974,456  $36,779,565  $9,194,891 ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Bridge Program / On-System (Non-NHS)           ►Bridge Program / On-System (Non-NHS)          
  Bridge Program 608522 Boston Region Middleton MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER 4 NHPP-Off  $3,933,440  $3,146,752  $786,688 Construction 608522 MIDDLETON- BRIDGE REPLACEMENT, M-20-003, ROUTE 62 (MAPLE STREET) OVER IPSWICH RIVER  $3,933,440        
  Bridge Program 608596 Boston Region Essex ESSEX- SUPERSTRUCTURE REPLACEMENT, E-11-001 (2TV), ROUTE 133\MAIN STREET OVER ESSEX RIVER 4 NHPP-Off  $4,028,000  $3,222,400  $805,600 Construction 608596 ESSEX- SUPERSTRUCTURE REPLACEMENT, E-11-001 (2TV), ROUTE 133\MAIN STREET OVER ESSEX RIVER  $4,028,000        
  Bridge Program 608009 Boston Region Boxborough BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495 3 NHPP-Off  $5,147,500  $4,118,000  $1,029,500 Construction / AC Year 2 of 2, Total Cost $14,295,000 608009 BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495  $5,147,500        
Bridge Program / On-System (Non-NHS) subtotal ►  $13,108,940  $10,487,152  $2,621,788 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Bridge Program / Systematic Maintenance           ►Bridge Program / Systematic Maintenance          
  Bridge Program Project # MPO Municipalities Description District NHPP-On  $-    $-    $-     Project # Description  $-          
Bridge Program / Systematic Maintenance subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Interstate Pavement           ►Interstate Pavement          
  Interstate Pavement Project # MPO Multiple Description District NHPP  $-    $-    $-     Project # Description  $-          
Insterstate Pavement subtotal ►  $-    $-    $-   ◄ 90% Federal + 10% Non-Federal     Quantified Impact ► #REF!    
             
►Non-Interstate Pavement           ►Non-Interstate Pavement          
  Non-Interstate Pavement 608493 Boston Region Topsfield TOPSFIELD- RESURFACING AND RELATED WORK ON ROUTE 1 4 NHPP  $9,119,040  $7,295,232  $1,823,808 Construction 608493 TOPSFIELD- RESURFACING AND RELATED WORK ON ROUTE 1  $9,119,040        
  Non-Interstate Pavement 608495 Boston Region Multiple CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A 4 NHPP  $3,171,840  $2,537,472  $634,368 Construction 608495 CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A  $3,171,840        
  Non-Interstate Pavement 608498 Boston Region Multiple HINGHAM- WEMOUTH- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53 5 NHPP  $7,929,600  $6,343,680  $1,585,920 Construction 608498 HINGHAM- WEMOUTH- BRAINTREE- RESURFACING AND RELATED WORK ON ROUTE 53  $7,929,600        
Non-Interstate Pavement subtotal ►  $20,220,480  $16,176,384  $4,044,096 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
► Roadway Improvements           ► Roadway Improvements          
  Roadway Improvements Project # MPO N/A Description District STP  $-    $-    $-     Project # Description  $-          
Roadway Improvements subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Safety Improvements           ► Safety Improvements          
  Safety Improvements Project # MPO Multiple Description District STP  $-    $-    $-     Project # Description  $-          
Safety Improvements subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 2B / State Prioritized Modernization Projects ►Section 2B / State Prioritized Modernization Projects
             
► ADA Retrofits           ► ADA Retrofits          
  ADA Retrofits Project # Statewide Multiple Description 4 STP  $-    $-    $-     Project # Description  $-          
ADA Retrofits subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Intersection Improvements           ►Intersection Improvements          
  Intersection Improvements 608566 Boston Region Marlborough MARLBOROUGH- IMPROVEMENTS AT ROUTE 20 (EAST MAIN STREET) AT CURTIS AVENUE 3 HSIP  $2,784,000  $2,505,600  $278,400 Construction / PSAC score 51.5 608566 MARLBOROUGH- IMPROVEMENTS AT ROUTE 20 (EAST MAIN STREET) AT CURTIS AVENUE  $2,784,000        
  Intersection Improvements 608567 Boston Region Peabody PEABODY- IMPROVEMENTS AT ROUTE 114 AT SYLVAN STREET, CROSS STREET, NORTHSHORE MALL, LORIS ROAD, ROUTE 128 INTERCHANGE AND ESQUIRE DRIVE 4 HSIP  $2,784,000  $2,505,600  $278,400 Construction / PSAC score 61.5 608567 PEABODY- IMPROVEMENTS AT ROUTE 114 AT SYLVAN STREET, CROSS STREET, NORTHSHORE MALL, LORIS ROAD, ROUTE 128 INTERCHANGE AND ESQUIRE DRIVE  $2,784,000        
  Intersection Improvements 607342 Boston Region Milton MILTON- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD 6 HSIP  $1,531,200  $1,378,080  $153,120 Construction / PSAC score 43 607342 MILTON- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 28 (RANDOLPH AVENUE) & CHICKATAWBUT ROAD  $1,531,200        
  Intersection Improvements 608569 Boston Region Quincy QUINCY- INTERSECTION IMPROVEMENTS AT ROUTE 3A (SOUTHERN ARTERY) AND BROAD STREET 6 HSIP  $2,784,000  $2,505,600  $278,400 Construction / PSAC score 55 608569 QUINCY- INTERSECTION IMPROVEMENTS AT ROUTE 3A (SOUTHERN ARTERY) AND BROAD STREET  $2,784,000        
Intersection Improvements subtotal ►  $9,883,200  $8,894,880  $988,320 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Intelligent Transportation Systems           ►Intelligent Transportation Systems          
  Intelligent Transportation Systems Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Intelligent Transportation System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Roadway Reconstruction           ►Roadway Reconstruction          
  Roadway Reconstruction 607901 Boston Region Dedham DEDHAM- PEDESTRIAN IMPROVEMENTS ALONG ELM STREET & RUSTCRAFT ROAD CORRIDORS 6 CMAQ  $2,581,113  $2,064,890  $516,223 Construction / PSAC score 51.25 607901 DEDHAM- PEDESTRIAN IMPROVEMENTS ALONG ELM STREET & RUSTCRAFT ROAD CORRIDORS  $2,581,113        
  Roadway Reconstruction 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP  $37,500,000  $30,000,000  $7,500,000 Construction / Total Project Cost = $270,000,000 / AC YR 2 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $37,500,000        
Roadway Reconstruction subtotal ►  $40,081,113  $32,064,890  $8,016,223 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Section 2C / State Prioritized Expansion Projects ►Section 2C / State Prioritized Expansion Projects
             
►Bicycles and Pedestrians           ►Bicycles and Pedestrians          
  Bicycles and Pedestrians 607329 Boston Region Multiple WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L. 4 CMAQ  $7,084,000  $5,667,200  $1,416,800 Construction / PSAC score 32.5 607329 WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, FROM THE GALVIN MIDDLE SCHOOL TO LYNNFIELD/PEABODY T.L.  $7,084,000        
Bicycles and Pedestrians subtotal ►  $7,084,000  $5,667,200  $1,416,800 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Capacity           ►Capacity          
  Capacity Project # MPO Municipalities Description District CMAQ  $-    $-    $-     Project # Description  $-          
Capacity subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 3 / Planning / Adjustments / Pass-throughs ►Section 3 / Planning / Adjustments / Pass-throughs
             
►Planning / Adjustments / Pass-throughs           ►Planning / Adjustments / Pass-throughs          
  Planning / Adjustments / Pass-throughs Project # Statewide Multiple ABP GANS Repayment  Multiple NHPP  $-    $-    $-     Project # ABP GANS Repayment   $-          
Other Statewide Items subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
             
►Section 4 / Non-Federally Aided Projects ►Section 2A / Non-Federal Projects
             
►Non-Federally Aided Projects           ►Non-Federally Aided Projects          
  Non Federal Aid 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA  $18,112,483    $18,112,483 Construction / Total Project Cost = $270,000,000 / AC YR 2 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $18,112,483        
Non-Federal Aid subtotal►  $18,112,483    $18,112,483 ◄100% Non-Federal     Quantified Impact ► #REF!    
             
2021 Summary TIP Section 1 - 3: ▼ TIP Section 4: ▼ Total of All Projects ▼     2018 X Region MPO GHG Tracking Summary Total Quantified Impact ▼    
Total ►  $248,346,318  $18,112,483  $266,458,801 ◄ Total Spending in Region     Quantified Impact ► #REF!    
Federal Funds ►  $200,050,306    $200,050,306 ◄ Total Federal Spending in Region              
Non-Federal Funds ►  $48,296,012  $18,112,483  $66,408,495 ◄ Total Non-Federal Spending in Region              
                         
701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008.  Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road.  The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority.  For all projects contained in the TIP, the Commonwealth is the Awarding Authority.  Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation.   This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website:  http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

Transportation Improvement Program (TIP)
Project List (FY2021)
FTA Program Project Number Transit Agency FTA Activity Line Item Project Description Carryover (unobligated) Federal Funds State Funds TDC Local Funds Total Cost
5307                    
5307 RTD0005479 Cape Ann Transportation Authority 117A00 PREVENTIVE MAINTENANCE 2020 - $350,000 $350,000 $87,500 $0 $0 $437,500
5307 RTD0005480 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQ/COMP/SFTWR 2020 - $40,000 $40,000 $10,000 $0 $0 $50,000
5307 RTD0005163 MetroWest Regional Transit Authority 440000 Mobility Management 2020 - $25,000 $25,000 $6,250 $0 $0 $31,250
5307 RTD0006003 MetroWest Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV 2020 - $1,300,000 $1,300,000 $325,000 $0 $0 $1,625,000
5307 RTD0006004 MetroWest Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 2020 - $150,000 $150,000 $37,500 $0 $0 $187,500
5307 RTD0006005 MetroWest Regional Transit Authority 114200 ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 2020 - $248,415 $248,415 $62,104 $0 $0 $310,519
5307 RTD0006369 Massachusetts Bay Transportation Authority (MBTA) 121200 Revenue Vehicle Program $120,000,000 $0 $0 $30,000,000 $150,000,000
5307 RTD0006370 Massachusetts Bay Transportation Authority (MBTA) 126301 Systemwide Signals Program $25,840,976 $0 $0 $6,460,244 $32,301,220
          Subtotal $147,954,391 $528,354 $0 $36,460,244 $184,942,989
5309                    
5309 RTD0005988 Massachusetts Bay Transportation Authority (MBTA) 132303 Green Line Extension Project $146,121,000 $0 $0 $147,848,038 $293,969,038
          Subtotal $146,121,000 $0 $0 $147,848,038 $293,969,038
5310                    
          Subtotal $0 $0 $0 $0 $0
5311                    
          Subtotal $0 $0 $0 $0 $0
5337                    
5337 RTD0006371 Massachusetts Bay Transportation Authority (MBTA) 122405 Bridge & Tunnel Program $96,000,000 $0 $0 $24,000,000 $120,000,000
5337 RTD0006372 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $35,347,989 $0 $0 $8,836,997 $44,184,986
5337 RTD0006373 Massachusetts Bay Transportation Authority (MBTA) 124400 System Upgrades Program $16,000,000 $0 $0 $4,000,000 $20,000,000
          Subtotal $147,347,989 $0 $0 $36,836,997 $184,184,986
5339                    
5339 RTD0006374 Massachusetts Bay Transportation Authority (MBTA) 111400 Bus Program $5,552,214 $0 $0 $1,388,053 $6,940,267
          Subtotal $5,552,214 $0 $0 $1,388,053 $6,940,267
5320                    
          Subtotal $0 $0 $0 $0 $0
Other Federal                    
          Subtotal $0 $0 $0 $0 $0
Other Non-Federal                    
          Subtotal $0 $0 $0 $0 $0
          Total $446,975,594 $528,354 $0 $222,533,332 $670,037,280
Funds listed under the Carry Over column are included in the Federal Amount

 

2022 Boston Region Transportation Improvement Program       2022 GHG Tracking for Boston Region Transportation Improvement Program
     
Amendment /
Adjustment Type ▼
STIP                             Program ▼ MassDOT Project ID Metropolitan Planning Organization ▼ Municipality Name ▼ MassDOT                                                                                                              Project                                                                                               Description MassDOT  District Funding                       Source Total Programmed                Funds Federal                    Funds Non-Federal                        Funds Additional Information ▼                                   Present information as follows, if applicable: a) Planning / Design / or Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information MassDOT Project ID MassDOT                                                                                                              Project Description Total Programmed                Funds GHG        Analysis  Type GHG CO2 Impact (kg/yr) GHG                                                                          Impact Description Additional                                                                          Description
             
►Section 1A / Regionally Prioritized Projects ►Section 1A / Regionally Prioritized Projects
             
►Regionally Prioritized Projects           ►Regionally Prioritized Projects          
Roadway reconstruction program 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 TAP  $2,000,000  $1,600,000  $400,000 Construction; TAP+STP Total Cost = $152,000,000; AC Yr 3 of 5; Total funding in this TIP = $76,500,000              
Roadway reconstruction program 606226 Boston Region Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 STP  $40,445,768  $32,356,614  $8,089,154 Construction; TAP+STP Total Cost = $152,000,000; AC Yr 3 of 5; Total funding in this TIP = $76,626,515              
Intersection improvements program 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 HSIP  $631,724  $568,552  $63,172 Construction; HSIP+CMAQ+STP Total Cost = $9,377,782; MPO Evaluation Score = 55              
Intersection improvements program 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 CMAQ  $3,000,000  $2,400,000  $600,000 Construction; HSIP+CMAQ+STP Total Cost = $9,377,782; MPO Evaluation Score = 55              
Intersection improvements program 605857 Boston Region Norwood NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET  5 STP  $5,746,058  $4,596,846  $1,149,212 Construction; HSIP+CMAQ+STP Total Cost = $9,377,782; MPO Evaluation Score = 55              
  Planning / Adjustments / Pass-throughs BN0009 Boston Region Multiple COMMUNITY TRANSPORTATION PROGRAM NA CMAQ  $1,000,000  $800,000  $200,000 Planning, Design, or Construction; Set Aside for LRTP Clean Air and Mobility Program BN0009 COMMUNITY TRANSPORTATION PROGRAM  $1,000,000        
Bicycles and pedestrians program 607738 Boston Region Bedford BEDFORD- MINUTEMAN BIKEWAY EXTENSION, FROM LOOMIS STREET TO THE CONCORD T.L. 4 CMAQ  $3,000,000  $2,400,000  $600,000 Construction; CMAQ+TAP+STP Total Cost = $4,647,192; MPO Evaluation Score = 47              
Bicycles and pedestrians program 607738 Boston Region Bedford BEDFORD- MINUTEMAN BIKEWAY EXTENSION, FROM LOOMIS STREET TO THE CONCORD T.L. 4 TAP  $350,000  $280,000  $70,000 Construction; CMAQ+TAP+STP Total Cost = $4,647,192; MPO Evaluation Score = 47              
Bicycles and pedestrians program 607738 Boston Region Bedford BEDFORD- MINUTEMAN BIKEWAY EXTENSION, FROM LOOMIS STREET TO THE CONCORD T.L. 4 STP  $4,512,878  $3,610,302  $902,576 Construction; CMAQ+TAP+STP Total Cost = $4,647,192; MPO Evaluation Score = 47              
Bicycles and pedestrians program 608164 Boston Region Sudbury SUDBURY- BIKE PATH CONSTRUCTION (BRUCE FREEMAN RAIL TRAIL) 3 CMAQ  $3,000,000  $2,400,000  $600,000 Construction; CMAQ+TAP+STP Total Cost = $8,004,000; MPO Evaluation Score = 40              
Bicycles and pedestrians program 608164 Boston Region Sudbury SUDBURY- BIKE PATH CONSTRUCTION (BRUCE FREEMAN RAIL TRAIL) 3 TAP  $500,000  $400,000  $100,000 Construction; CMAQ+TAP+STP Total Cost = $8,004,000; MPO Evaluation Score = 40              
Bicycles and pedestrians program 608164 Boston Region Sudbury SUDBURY- BIKE PATH CONSTRUCTION (BRUCE FREEMAN RAIL TRAIL) 3 STP  $4,504,000  $3,603,200  $900,800 Construction; CMAQ+TAP+STP Total Cost = $8,004,000; MPO Evaluation Score = 40              
  Roadway reconstruction program 607777 Boston Region Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 HSIP  $2,000,000  $1,800,000  $200,000 Construction; HSIP+CMAQ+STP Total Cost = $14,190,425; MPO Evaluation Score = 75 607777 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16)  $2,000,000        
  Roadway reconstruction program 607777 Boston Region Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 CMAQ  $1,000,000  $800,000  $200,000 Construction; HSIP+CMAQ+STP Total Cost = $14,190,425; MPO Evaluation Score = 75              
  Roadway reconstruction program 607777 Boston Region Watertown WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) 6 STP  $11,190,425  $8,952,340  $2,238,085 Construction; HSIP+CMAQ+STP Total Cost = $14,190,425; MPO Evaluation Score = 75              
  Roadway reconstruction program 608078 Boston Region Chelsea CHELSEA- RECONSTRUCTION ON BROADWAY (ROUTE 107), FROM CITY HALL AVENUE TO THE REVERE C.L. 6 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+STP Total Cost = $9,028,628; MPO Evaluation Score = 61 608078 CHELSEA- RECONSTRUCTION ON BROADWAY (ROUTE 107), FROM CITY HALL AVENUE TO THE REVERE C.L.  $1,000,000        
  Roadway reconstruction program 608078 Boston Region Chelsea CHELSEA- RECONSTRUCTION ON BROADWAY (ROUTE 107), FROM CITY HALL AVENUE TO THE REVERE C.L. 6 STP  $8,028,628  $6,422,902  $1,605,726 Construction; CMAQ+STP Total Cost = $9,028,628; MPO Evaluation Score = 61              
  Roadway reconstruction program 608229 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS AT KELLEY'S CORNER, ROUTE 111 (MASSACHUSETTS AVENUE) AND ROUTE 27 (MAIN STREET) 3 CMAQ  $1,000,000  $800,000  $200,000 Construction; CMAQ+TAP+STP Total Cost = $8,671,000; MPO Evaluation Score = 45              
  Roadway reconstruction program 608229 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS AT KELLEY'S CORNER, ROUTE 111 (MASSACHUSETTS AVENUE) AND ROUTE 27 (MAIN STREET) 3 TAP  $200,000  $160,000  $40,000 Construction; CMAQ+TAP+STP Total Cost = $8,671,000; MPO Evaluation Score = 45 608229 ACTON- INTERSECTION & SIGNAL IMPROVEMENTS AT KELLEY'S CORNER, ROUTE 111 (MASSACHUSETTS AVENUE) AND ROUTE 27 (MAIN STREET)  $200,000        
  Roadway reconstruction program 608229 Boston Region Acton ACTON- INTERSECTION & SIGNAL IMPROVEMENTS AT KELLEY'S CORNER, ROUTE 111 (MASSACHUSETTS AVENUE) AND ROUTE 27 (MAIN STREET) 3 STP  $7,471,000  $5,976,800  $1,494,200 Construction; CMAQ+TAP+STP Total Cost = $8,671,000; MPO Evaluation Score = 45              
  Roadway reconstruction program 608146 Boston Region Marblehead MARBLEHEAD- INTERSECTION IMPROVEMENTS AT PLEASANT STREET & VILLAGE, VINE AND CROSS STREETS   4 STP  $959,378  $767,502  $191,876 Construction; STP Total Cost = $959,378; MPO Evaluation Score = 40              
Regionally Prioritized Projects subtotal ►  $49,716,309  $39,973,047  $9,743,262 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Section 1A / Fiscal Constraint Analysis                      
Total Regional Federal Aid Funds Programmed ►  $101,539,859  $101,539,859 ◄Total Budget  $(0) Funds Over Programmed              
Section 1A instructions: MPO Template Name) Choose Regional Name from dropdown list to populate header and MPO column; Column C) Enter ID from ProjectInfo; Column E) Choose Municipality Name from dropdown list; Column H) Choose the Funding Source being used for the project - if multiple funding sources are being used enter multiple lines; Column I) Enter the total amount of funds being programmed in this fiscal year and for each funding source; Column J) Federal funds autocalculates. Please verify the amount and only change if needed for flex. Column K) Non-federal funds autocalculates. Please verify the split/match - if matching an FTA flex, coordinate with Rail & Transit Division before programming; Column L) Enter Additional Information as described - please do not use any other format. STP programmed ►  $82,858,135  $83,572,288 ◄ Max STP  $714,153 STP available              
HSIP programmed ►  $2,631,724  $4,296,710 ◄ Min. HSIP  $1,664,986 HSIP recommended not met              
CMAQ programmed ►  $13,000,000  $10,741,776 ◄ Min. CMAQ  $(2,258,224) CMAQ recommended met              
TAP programmed ►  $3,050,000  $2,929,085 ◄ Min. TAP  $(120,915) TAP amount exceeded!              
HSIP, CMAQ, TAP Overprogrammed  $(0)                    
►Section 1B / Earmark or Discretionary Grant Funded Projects ►Section 1B / Earmark or Discretionary Grant Funded Projects
             
►Other Federal Aid           ►Other Federal Aid          
  Earmark Discretionary Project # Boston Municipalities Description District HPP  $-    $-    $-     Project # Description  $-          
  Earmark Discretionary Project # Boston Municipalities Description District HPP  $-    $-    $-     Project # Description  $-          
Other Federal Aid subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
               
►Section 2A / State Prioritized Reliability Projects ►Section 2A / State Prioritized Reliability Projects
             
►Bridge Program / Inspections           ►Bridge Program / Inspections          
  Bridge Program Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Bridge Program / Inspections subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / Off-System           ►Bridge Program / Off-System          
  Bridge Program Project # MPO N/A Description District STP-BR-OFF  $-    $-    $-     Project # Description  $-          
Bridge Program / Off-System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (NHS)           ►Bridge Program / On-System (NHS)          
  Bridge Program 606728 Boston Region Boston BOSTON- SUPERSTRUCTURE REPAIRS ON B-16-365, BOWKER OVERPASS OVER STORROW DRIVE (EB) 6 NHPP-On  $24,009,680  $19,207,744  $4,801,936 Construction 606728 BOSTON- SUPERSTRUCTURE REPAIRS ON B-16-365, BOWKER OVERPASS OVER STORROW DRIVE (EB)  $24,009,680        
Bridge Program / On-System (NHS) subtotal ►  $24,009,680  $19,207,744  $4,801,936 ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Bridge Program / On-System (Non-NHS)           ►Bridge Program / On-System (Non-NHS)          
  Bridge Program Project # MPO Municipalities Description District NHPP-Off  $-    $-    $-     Project # Description  $-          
Bridge Program / On-System (Non-NHS) subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Bridge Program / Systematic Maintenance           ►Bridge Program / Systematic Maintenance          
  Bridge Program Project # MPO Municipalities Description District NHPP-On  $-    $-    $-     Project # Description  $-          
Bridge Program / Systematic Maintenance subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Interstate Pavement           ►Interstate Pavement          
  Interstate Pavement 608210 Boston Region Multiple FOXBOROUGH- PLAINVILLE- WRENTHAM- FRANKLIN- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 5 NHPP  $11,497,920  $10,348,128  $1,149,792 Construction 608210 FOXBOROUGH- PLAINVILLE- WRENTHAM- FRANKLIN- INTERSTATE MAINTENANCE & RELATED WORK ON I-495  $11,497,920        
Insterstate Pavement subtotal ►  $11,497,920  $10,348,128  $1,149,792 ◄ 90% Federal + 10% Non-Federal     Quantified Impact ► #REF!    
             
►Non-Interstate Pavement           ►Non-Interstate Pavement          
  Non-Interstate Pavement 608817 Boston Region Multiple SALEM- LYNN- RESURFACING AND RELATED WORK ON ROUTE 107 4 NHPP  $2,566,500  $2,053,200  $513,300 Construction 608817 SALEM- LYNN- RESURFACING AND RELATED WORK ON ROUTE 107  $2,566,500        
  Non-Interstate Pavement 608818 Boston Region Danvers DANVERS- RESURFACING AND RELATED WORK ON ROUTE 114 4 NHPP  $1,916,320  $1,533,056  $383,264 Construction 608818 DANVERS- RESURFACING AND RELATED WORK ON ROUTE 114  $1,916,320        
Non-Interstate Pavement subtotal ►  $4,482,820  $3,586,256  $896,564 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Roadway Improvements           ► Roadway Improvements          
  Roadway Improvements Project # MPO N/A Description 5 STP  $-    $-    $-     Project # Description  $-          
Roadway Improvements subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
► Safety Improvements           ► Safety Improvements          
  Safety Improvements Project # MPO N/A Description Multiple HSIP  $-    $-    $-     Project # Description  $-          
Safety Improvements subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 2B / State Prioritized Modernization Projects ►Section 2B / State Prioritized Modernization Projects
             
► ADA Retrofits           ► ADA Retrofits          
  ADA Retrofits Project # MPO Municipalities Description District STP  $-    $-    $-     Project # Description  $-          
ADA Retrofits subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Intersection Improvements           ►Intersection Improvements          
  Intersection Improvements Project # MPO Municipalities Description District HSIP  $-    $-    $-     Project # Description  $-          
Intersection Improvements subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
►Intelligent Transportation Systems           ►Intelligent Transportation Systems          
  Intelligent Transportation Systems Project # MPO Municipalities Description District NHPP  $-    $-    $-     Project # Description  $-          
Intelligent Transportation System subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► 0    
             
►Roadway Reconstruction           ►Roadway Reconstruction          
  Roadway Reconstruction 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NHPP  $37,500,000  $30,000,000  $7,500,000 Construction / Total Project Cost = $270,000,000 / AC YR 3 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $37,500,000        
Roadway Reconstruction subtotal ►  $37,500,000  $30,000,000  $7,500,000 ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Section 2C / State Prioritized Expansion Projects ►Section 2C / State Prioritized Expansion Projects
             
►Bicycles and Pedestrians           ►Bicycles and Pedestrians          
  Bicycles and Pedestrians Project # MPO N/A Description District CMAQ  $-    $-    $-     Project # Description  $-          
Bicycles and Pedestrians subtotal ►  $-    $-    $-   ◄ 80% Federal + 20% Non-Federal     Quantified Impact ► #REF!    
             
►Capacity           ►Capacity          
  Capacity Project # MPO Municipalities Description District CMAQ  $-    $-    $-     Project # Description  $-          
Capacity subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► #REF!    
             
►Section 3 / Planning / Adjustments / Pass-throughs ►Section 3 / Planning / Adjustments / Pass-throughs
             
►Planning / Adjustments / Pass-throughs           ►Planning / Adjustments / Pass-throughs          
  Planning / Adjustments / Pass-throughs Project # Statewide Multiple Description Multiple NHPP  $-    $-    $-     Project # Description  $-          
Other Statewide Items subtotal ►  $-    $-    $-   ◄ Funding Split Varies by Funding Source     Quantified Impact ► 0    
             
             
►Section 4 / Non-Federally Aided Projects ►Section 2A / Non-Federal Projects
             
►Non-Federally Aided Projects           ►Non-Federally Aided Projects          
  Non Federal Aid 607977 Boston Region Multiple HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE 3 NFA  $18,112,483    $18,112,483 Construction / Total Project Cost = $270,000,000 / AC YR 3 of 6 / PSAC score 49 607977 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE  $18,112,483        
Non-Federal Aid subtotal►  $18,112,483    $18,112,483 ◄100% Non-Federal     Quantified Impact ► #REF!    
             
2022 Summary TIP Section 1 - 3: ▼ TIP Section 4: ▼ Total of All Projects ▼     2018 X Region MPO GHG Tracking Summary Total Quantified Impact ▼    
Total ►  $127,206,729  $18,112,483  $145,319,212 ◄ Total Spending in Region     Quantified Impact ► #REF!    
Federal Funds ►  $103,115,175    $103,115,175 ◄ Total Federal Spending in Region              
Non-Federal Funds ►  $24,091,554  $18,112,483  $42,204,037 ◄ Total Non-Federal Spending in Region              
701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008.  Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road.  The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority.  For all projects contained in the TIP, the Commonwealth is the Awarding Authority.  Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation.   This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website:  http://www.massdot.state.ma.us/Highway/flaggers/main.aspx

 

Transportation Improvement Program (TIP)
Project List (FY2022)
FTA Program Project Number Transit Agency FTA Activity Line Item Project Description Carryover (unobligated) Federal Funds State Funds TDC Local Funds Total Cost
5307                    
5307 RTD0006090 Cape Ann Transportation Authority 117A00 PREVENTIVE MAINTENANCE 2021 - $325,000 $325,000 $0 $0 $81,250 $406,250
5307 RTD0006091 Cape Ann Transportation Authority 114206 ACQUIRE - SHOP EQUIPMENT 2021 - $40,000 $40,000 $10,000 $0 $0 $50,000
5307 RTD0006299 MetroWest Regional Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV 2021 - $1,300,000 $1,300,000 $325,000 $0 $0 $1,625,000
5307 RTD0006300 MetroWest Regional Transit Authority 114200 ACQUISITION OF BUS SUPPORT EQUIP/FACILITIES 2021 - $248,415 $248,415 $62,104 $0 $0 $310,519
5307 RTD0006301 MetroWest Regional Transit Authority 113403 TERMINAL, INTERMODAL (TRANSIT) 2021 - $150,000 $150,000 $37,500 $0 $0 $187,500
5307 RTD0006302 MetroWest Regional Transit Authority 440000 Mobility Management 2021 - $25,000 $25,000 $6,250 $0 $0 $31,250
5307 RTD0006375 Massachusetts Bay Transportation Authority (MBTA) 121200 Revenue Vehicle Program $80,000,000 $0 $0 $20,000,000 $100,000,000
5307 RTD0006376 Massachusetts Bay Transportation Authority (MBTA) 126301 Systemwide Signals Program $65,840,976 $0 $0 $16,460,244 $82,301,220
          Subtotal $147,929,391 $440,854 $0 $36,541,494 $184,911,739
5309                    
          Subtotal $0 $0 $0 $0 $0
5310                    
          Subtotal $0 $0 $0 $0 $0
5311                    
          Subtotal $0 $0 $0 $0 $0
5337                    
5337 RTD0006377 Massachusetts Bay Transportation Authority (MBTA) 122405 Bridge & Tunnel Program $72,000,000 $0 $0 $18,000,000 $90,000,000
5337 RTD0006378 Massachusetts Bay Transportation Authority (MBTA) 123400 Stations and Facilities Program $11,347,989 $0 $0 $2,836,997 $14,184,986
5337 RTD0006379 Massachusetts Bay Transportation Authority (MBTA) 126301 Systemwide Signals Program $64,000,000 $0 $0 $16,000,000 $80,000,000
          Subtotal $147,347,989 $0 $0 $36,836,997 $184,184,986
5339                    
5339 RTD0006380 Massachusetts Bay Transportation Authority (MBTA) 111400 Bus Program $5,552,214 $0 $0 $1,388,053 $6,940,267
          Subtotal $5,552,214 $0 $0 $1,388,053 $6,940,267
5320                    
          Subtotal $0 $0 $0 $0 $0
Other Federal                    
          Subtotal $0 $0 $0 $0 $0
Other Non-Federal                    
          Subtotal $0 $0 $0 $0 $0
          Total $300,829,594 $440,854 $0 $74,766,544 $376,036,992
Funds listed under the Carry Over column are included in the Federal Amount