Through its federal Transit Asset Management (TAM) rule,1 the Federal Transit Administration (FTA) requires transit agencies, metropolitan planning organizations (MPO), and state agencies to collaborate to achieve and maintain a state of good repair for transit systems. FTA requires transit providers that receive federal funds and own, operate, or manage capital assets used to provide public transportation—and states coordinating groups of these transit providers—to establish targets each year for federally required TAM performance measures. These measures relate to the condition of transit rolling stock, nonrevenue service vehicles, facilities, and rail fixed guideway infrastructure. Meanwhile, FTA requires MPOs to set regional performance targets for these TAM measures in coordination with transit and state agencies. This memorandum proposes updates to the Boston Region MPO’s existing set of TAM performance targets, which the MPO last updated in March 2022.

 

MPOs are federally required to review their TAM performance targets when updating their Long-Range Transportation Plan (LRTP) or Transportation Improvement Program (TIP). As part of its annual TIP update, MPO staff recommends that the MPO vote to adopt the proposed updates to its regional TAM targets presented in this memorandum at its March 9, 2023, meeting. These proposed updated targets are based on state fiscal year (SFY) 2023 (July 2022 to June 2023) targets set by the Massachusetts Bay Transportation Authority (MBTA), the MetroWest Regional Transit Authority (MWRTA), and the Cape Ann Transportation Authority (CATA). These targets account for recent asset inventory and condition data and these agencies’ expectations for asset procurement and improvement during SFY 2023. Upon MPO approval, MPO staff would incorporate these updated TAM targets into its federal fiscal years (FFYs) 2024–28 TIP.

 

1          TAM REQUIREMENTS

The FTA’s TAM rule requires applicable transit providers to carry out several activities to achieve and maintain a state of good repair for their assets:

 

 

The FTA requires transit agencies to update their TAM Plans every four years. The MBTA, CATA, and MWRTA adopted their first plans in 2018 and updated them in 2022. These agencies also submit transit asset inventory and condition data as of the end of the previous fiscal year to NTD, along with performance targets for the following fiscal year. These one-year TAM targets are essentially forecasts because they account for recent available data on the number and condition of relevant transit assets and the anticipated effect that capital investment and procurement will have on TAM performance.

 

MPOs also have TAM responsibilities, which are defined by the FTA’s TAM Rule and the Statewide and Nonmetropolitan Transportation Planning and Metropolitan Transportation Planning rule, which sets requirements for MPO planning processes.2 MPO TAM responsibilities include

 

 

2          TAM Performance Measures

The TAM Rule specifies four performance measures, which apply to four TAM asset categories: rolling stock (vehicles that provide passenger service), equipment (nonrevenue service vehicles), facilities, and infrastructure (rail fixed guideway systems). Table 1 describes these measures.

 

Table 1
TAM Performance Measures by Asset Category

Asset Category

Relevant Assets

Measure

Measure Type

Desired Direction

Rolling Stock

Buses, vans, and sedans; light and heavy rail cars; commuter rail cars and locomotives; ferry boats

Percentage of revenue vehicles that have met or exceeded their ULB

Age-based

Minimize percentage

Equipment

Service support, maintenance, and other nonrevenue vehicles

Percentage of vehicles that have met or exceeded their ULB

Age-based

Minimize percentage

Facilities

Passenger stations and stops, parking facilities, administration and maintenance facilities*

Percentage of assets with condition rating lower than 3.0 on FTA TERM Scale

Condition-based

Minimize percentage

Infrastructure

Rail fixed guideway systems

Percentage of track segments with performance (speed) restrictions, by mode

Performance-based

Minimize percentage

* Stops that meet the threshold for a passenger facility are listed in the FTA’s TAM Facility Performance Measure Reporting Guidebook, available at https://www.transit.dot.gov/regulations-and-guidance/asset-management/tam-facility-performance-measure-reporting-guidebook.

FTA = Federal Transit Administration. TAM = Transit Asset Management. TERM = Transit Economic Requirements Model. ULB = Useful Life Benchmark.

 

Two definitions apply to these performance measures:

 

 

Information about the Boston Region MPO’s past TAM targets, which reflect targets provided by the MBTA, MWRTA, and CATA, can be accessed via the Performance-based Planning and Programming page on the MPO website (www.bostonmpo.org/performance).

 

3          SFY 2023 TAM Performance Targets

3.1      Process

The MBTA, MWRTA, and CATA have developed a set of SFY 2023 TAM targets that account for recent asset inventory and condition data and these agencies’ expectations of the effects that capital investment will have on asset procurement and improvement in SFY 2023. When setting targets, each agency has discretion to use FTA-identified default ULBs for vehicles or to adjust ULBs with approval from the FTA. The MBTA has used FTA default ULBs for all vehicle types except for paratransit autos and vans, some articulated buses, and some light rail vehicles, which are measured using MBTA-defined ULBs. The MWRTA uses FTA default ULBs for vans and equipment vehicles (excluding automobiles) and uses ULBs from the Massachusetts Department of Transportation’s Fully Accessible Vehicle Guide for its cutaway vehicles and automobiles.5 CATA uses useful life criteria as defined in FTA Circular 5010.1E (Award Management Requirements) for ULB values for its vehicles.6

 

MPO staff used these SFY 2023 MBTA, CATA, and MWRTA targets to propose an updated set of TAM targets for the Boston region, which are shown in Tables 2 through 5. MPO staff recommends that the MPO reflect transit agency TAM target values and SFY time frames when incorporating TAM elements into its planning and coordination processes. After consulting with the MBTA, CATA, and MWRTA, MPO staff has aggregated or reorganized some target information provided by these transit agencies for particular asset subgroups. When compared to SFY 2022 performance, the SFY 2023 TAM targets described in Tables 2 through 5 may reflect changes in the overall number of assets in each transit category, past or planned asset replacement or repair, other factors depending on the asset type, or a combination of these factors. These performance values and targets may also reflect some recent updates to data or the reclassification of assets into different categories. MPO staff notes that the required TAM performance measures for which targets are set focus on specific proxies for transit asset state of good repair, as noted in the Measure Type column in Table 1. These proxies may not reflect asset condition or performance or do so in a comprehensive way.

 

FTA will neither penalize transit agencies or MPOs for not achieving regional TAM targets nor reward these entities for attaining them. FTA will review how the MPO is incorporating performance-based planning and programming practices, including those related to TAM, into its planning process during quadrennial certification reviews.

 

3.2      Proposed Targets

Table 2 describes SFY 2022 performance and SFY 2023 targets for transit rolling stock. The performance measure that applies to these assets is the percentage of vehicles that have met or exceeded their ULB.


 

Table 2
SFY 2022 Performance and SFY 2023 Targets
for Rolling Stock, by Agency

 

 

SFY 2022 Performance
(as of 6/30/2022)

SFY 2023 Performance
(as of 6/30/2023)

Agency

Asset Type

Number of Vehicles

Number of Vehicles
≥ ULB

Percent of Vehicles
≥ ULB

Target Percent of Vehicles
≥ ULB

MBTA

Articulated Buses

105

0

0%

18%

MBTA

Buses

952

307

32%

32%

MBTA

Light Rail Vehicles

227

0

0%

0%

MBTA

Vintage Trolleysa

7

7

100%

100%

MBTA

Heavy Rail Vehiclesb

472

252

53%

39%*

MBTA

Commuter Rail Locomotives

81

19

23%

23%

MBTA

Commuter Rail Coaches

393

30

8%

7%

MBTA

Ferry Boats

4

0

0%

0%

MBTA

Paratransit Vehiclesc

704

0

0%

0%

CATA

Buses

16

4

25%

30%

CATA

Cutaway Vehiclesd

16

10

63%

5%*

MWRTA

Automobiles

2

2

100%

100%

MWRTA

Vanse

3

0

0%

0%

MWRTA

Cutaway Vehiclesf

108

9

8%

25%

* The SFY 2023 target anticipates improved performance compared to SFY 2022 performance.
Note: The MBTA’s trolleybus fleet was retired from service in March 2022 and will not be reflected in its SFY 2023 asset inventory.

The number of articulated buses at or beyond their ULB is expected to increase to 18.11% in FY23 as older fleets reach ULB.

a MBTA vintage trolleys are used on the Ashmont-Mattapan High Speed Line.
b The targets account for Red and Orange Line vehicle delivery.
c
The MBTA THE RIDE paratransit vehicle data and targets reflect automobiles and vans.
d
The NTD defines a cutaway vehicle as a vehicle in which a bus body is mounted on a van or light-duty truck chassis, which may be reinforced or extended. CATA uses these vehicles to provide fixed route and demand response service.
e
MWRTA’s vans are used to provide demand response service.

f MWRTA uses cutaway vehicles to provide fixed route and demand response service.
CATA = Cape Ann Transportation Authority. MBTA = Massachusetts Bay Transportation Authority.
MWRTA = MetroWest Regional Transit Authority. NTD = National Transit Database. = SFY = State Fiscal Year. ULB = Useful Life Benchmark.

Source: CATA, MBTA, MWRTA, and Boston Region MPO Staff.

 

Table 3 describes SFY 2022 performance and SFY 2023 targets for transit agency equipment, which refers to service support, maintenance, and other nonrevenue vehicles. MPO staff has aggregated targets for nonrevenue vehicle subtypes for each of the three transit agencies. The performance measure that applies to these assets is the percentage of vehicles that have met or exceeded their ULB.

Table 3
SFY 2022 Performance and SFY 2023 Targets
for Equipment (Nonrevenue Vehicles), by Agency

 

 

SFY 2022 Performance
(as of 6/30/2022)

SFY 2023 Performance
(as of 6/30/2023)

Agency

Asset Type

Number of Vehicles

Number of Vehicles
≥ ULB

Percent of Vehicles
≥ ULB

Target Percent of Vehicles
≥ ULB

MBTA

All Equipment

1,417

 

 

315

22%

25%

CATA

All Equipment

3

3

100%

100%

MWRTA

All Equipment

11

4

36%

50%

CATA = Cape Ann Transportation Authority. MBTA = Massachusetts Bay Transportation Authority.
MWRTA = MetroWest Regional Transit Authority. SFY = State Fiscal Year Revenue Year. ULB = Useful Life Benchmark.

Source: CATA, MBTA, MWRTA, and Boston Region MPO Staff.

 

Table 4 describes SFY 2022 performance and SFY 2023 targets for passenger facilities, such as stations and parking facilities, and administrative and maintenance facilities. The performance measure that applies to these assets is the percentage of facilities that have an FTA TERM scale score, which is a composite score based on assessments of facility components, of less than three. Facilities with scores below this threshold are considered to be in marginal or poor condition. A facility’s composite score is not a measure of the facility’s safety or operational performance.

 

Table 4
SFY 2022 Performance and SFY 2023 Targets
for Facilities, by Agency

 

 

SFY 2022 Performance
(as of 6/30/2022)

SFY 2023 Performance
(as of 6/30/2023)

Agency

Asset Type

Number of Facilities

Number of Facilities < 3.0

Percent of Facilities 
< 3.0

Target Percent of Facilities < 3.0

MBTA

Passenger/
Parking Facilitiesa,b

382

22

6%

7%

MBTA

Administrative/ Maintenance Facilitiesa

427

149

35%

35%

CATA

Administrative/Maintenance Facilities

1

0

0%

0%

MWRTA

Administrative/Maintenance Facilities

1

0

0%

0%

a The MBTA reports performance targets for facilities with a baseline consistent assessment, and continues to undertake physical condition assessments for all facilities.

b The FY23 target for passenger and parking facilities reflects the likelihood that five Commuter Rail assets will receive lower condition ratings this year: South Attleboro, West Newton, Newtonville, Lynn Garage, and Lynn Station

CATA = Cape Ann Transportation Authority. MBTA = Massachusetts Bay Transportation Authority.
MWRTA = MetroWest Regional Transit Authority. SFY = State Fiscal Year.

Source: CATA, MBTA, MWRTA, and Boston Region MPO Staff.

 

Table 5 describes SFY 2022 performance and SFY 2023 targets for infrastructure, specifically rail fixed guideway. The MBTA is the only transit agency in the Boston region with this asset type. The performance measure that applies to these assets is the percentage of track that is subject to performance (speed) restrictions. The MBTA samples the share of track segments with speed restrictions throughout the year.

 

Table 5
SFY 2022 Performance and SFY 2023
Targets for Infrastructure (Fixed Guideway), MBTA

 

SFY 2022 Performance
(as of 6/30/2022)

SFY 2023 Performance
(as of 6/30/2023)

Asset Type

Number of

Miles

Number of Miles with Performance

Restrictions

Percent of Miles with Performance

Restrictions

Target Percent

 of Miles with Performance

Restrictions

MBTA Transit Fixed Guidewaya

 127

 6

5%

2%b

MBTA Commuter Rail Fixed Guideway

641

22

3%

4%

Note: For this performance measure, the term “miles” refers to “directional route miles,” which represents the miles managed and maintained by the MBTA with respect to each direction of travel (for example, northbound and southbound), and excludes nonrevenue tracks such as yards, turnarounds, and storage tracks. The baseline and target percentages represent the annual average number of miles meeting this criterion over the 12-month reporting period.
a The MBTA’s Transit Fixed Guideway information reflects light rail and heavy rail fixed guideway networks.

b The SFY 2023 target anticipates improved performance compared to SFY 2022 performance.
MBTA = Massachusetts Bay Transportation Authority. SFY = State Fiscal Year.

Source: CATA, MBTA, MWRTA, and Boston Region MPO Staff.

 

4          REQUESTED ACTION AND NEXT STEPS

MPO staff recommends that the Boston Region MPO vote to adopt this set of SFY 2023 TAM performance targets for the Boston region. Should the MPO select this approach, staff will present and describe these targets in the performance chapter of the FFYs 2024–28 TIP document. Going forward, the MPO will work with transit agencies and the Massachusetts Department of Transportation to use TAM performance measures and targets to monitor the condition of transit assets in the region, and to consider what effect the transit programs and projects proposed for the MPO’s TIP will have on future transit state of good repair.

The Boston Region Metropolitan Planning Organization (MPO) operates its programs, services, and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color, or national origin (including limited English proficiency), be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination under any program or activity that receives federal assistance. Related federal nondiscrimination laws administered by the Federal Highway Administration, Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex, and disability. The Boston Region MPO considers these protected populations in its Title VI Programs, consistent with federal interpretation and administration. In addition, the Boston Region MPO provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166.

The Boston Region MPO also complies with the Massachusetts Public Accommodation Law, M.G.L. c 272 sections 92a, 98, 98a, which prohibits making any distinction, discrimination, or restriction in admission to, or treatment in a place of public accommodation based on race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, the Boston Region MPO complies with the Governor's Executive Order 526, section 4, which requires that all programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for by the state shall be conducted without unlawful discrimination based on race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability, veteran's status (including Vietnam-era veterans), or background.

A complaint form and additional information can be obtained by contacting the MPO or at http://www.bostonmpo.org/mpo_non_discrimination.

To request this information in a different language or in an accessible format, please contact

Title VI Specialist
Boston Region MPO
10 Park Plaza, Suite 2150
Boston, MA 02116
civilrights@ctps.org

By Telephone:
857.702.3700 (voice)

For people with hearing or speaking difficulties, connect through the state MassRelay service:

  • Relay Using TTY or Hearing Carry-over: 800.439.2370
  • Relay Using Voice Carry-over: 866.887.6619
  • Relay Using Text to Speech: 866.645.9870

For more information, including numbers for Spanish speakers, visit https://www.mass.gov/massrelay.

 

 

1 49 Code of Federal Regulations (CFR) Part 625.

2 The Statewide and Nonmetropolitan Transportation Planning and Metropolitan Transportation Planning rule is documented in 23 CFR Parts 450 and 771 and 49 CFR Part 613.

3 FTA. Performance Management. January 30, 2023. Accessed February 9, 2023, at www.transit.dot.gov/PerformanceManagement.

4 FTA. Default Useful Life Benchmark Cheat Sheet. October 25, 2021. Accessed February 9, 2023, at https://www.transit.dot.gov/TAM/ULBcheatsheet.

5 Massachusetts Department of Transportation. MassDOT Fully Accessible Vehicle Guide: An Overview of Accessible Vehicle Specifications. April 2022. Accessed February 9, 2023, at https://www.mass.gov/doc/massdot-fully-accessible-vehicle-guide/download.

6 FTA. FTA C 5010.E “Award Management Requirements.” July 16, 2018. Accessed February 9, 2023, at https://www.transit.dot.gov/regulations-and-guidance/fta-circulars/award-management-requirements-circular-50101e.